Utilities

Australia’s largest energy transmission project is now 90 pct complete

Published by

Transmission company Transgrid says Project EnergyConnect, the largest transmission project in the country to date that will link renewable-dominated South Australia with the coal-heavy NSW, is now 90 per cent complete.

The project is already partially complete and operating, with ElectraNet completing the first 200 km link from Robertstown in South Australia to Buronga in NSW and Red Cliffs in Victoria on time and on budget. But the longer NSW component has faced delays and cost increases.

The transmission link is a key part of the Australian Energy Market Operator’s grid roadmap and is considered critical to unlocking key renewable energy resources in the south-west of NSW, and also providing added grid security to help South Australia reach its target of 100 per cent net renewables by 2027.

Transgrid says crews working on its 700 kilometre part of the project have now clocked over 10 million worker hours. Construction on the NSW-Western Section got underway in 2022, followed in the middle of 2023 by work on the NSW-Eastern Section.

“Ten million worker hours is a remarkable achievement for our project teams and testament to their dedication, resilience and professionalism,” said Gordon Taylor, executive general manager of major projects at Transgrid, T

“In addition to building 700 kilometres of new transmission lines, the project also includes one of the largest and most sophisticated substations in the Southern Hemisphere at Buronga, a major expansion of the existing Wagga Wagga substation, and a new world-class substation at Dinawan near Bundure, NSW.

“More than 1,500 people have been a part of this colossal construction effort, from riggers and doggers, to engineers and electricians, to trainees and apprentices, environmental and support personnel.

“We’re pleased to have also worked alongside 325 local businesses to deliver the project, investing more than $264 million in supplier contracts, helping them grow and create local jobs as well as supporting the local economy.

The New South Wales sector is expected to consist of more than 1,500 steel towers and over 10,000 kilometres of cabling.

The landmark Buronga substation, the largest and most complex substation in the Southern Hemisphere, was completed in August, marking a significant milestone in the project’s development.

If you would like to join more than 28,000 others and get the latest clean energy news delivered straight to your inbox, for free, please click here to subscribe to our free daily newsletter.

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Joshua S Hill

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Share
Published by

Recent Posts

Pressure mounts to make “balcony solar” legal in Australia, as it goes on sale in the UK

As plug-in solar hits stores in the UK, lobby groups are reminding governments and regulators…

29 August 2026

Energy Insiders Podcast: Why we need regional leaders for renewable transition

Sabiene Heindl from The Energy Charter on the need for strong regional leaders for transition…

28 August 2026

“Paint the bloody things green”: Big battery developers are facing local push back – are they ready?

Big battery developers are facing increasing scrutiny from local communities about their projects. Some of…

28 August 2026

Solar and wind lead emissions falls, EVs pitch in – but bigger cuts needed to meet climate target

Record levels of solar, wind and battery use are pushing down emissions in Australia but…

28 August 2026

Gas for data centres, solar for the grid: NT seeks new PV plant to take load off costly gas peakers

As the NT government fights to power future data centres with gas, its publicly-owned utility…

28 August 2026

Still no word on Snowy 2.0 as Bowen underlines importance of transmission: “They are not being built for fun”

Bowen says transmission projects are key, including the VNI West link now under threat from…

28 August 2026