Commentary

Pumped hydro doesn’t have to be expensive: If it is, it might be in the wrong spot

Published by

Australian pumped hydro energy storage (PHES) project proposals tend not to be located at premium sites, which translates to higher cost projects.

Australia has 300 premium (Class AA) pumped hydro sites listed in the global pumped hydro atlas in the size range 15-5000 GWh. For perspective, 5000 GWh is the effective storage in 100 million EV batteries.

The key parameters for low-cost premium PHES are explained in our new review paper

– Large head (>500m) is the most important geographical factor. Using a site with the same volume of water but with double the head will double the energy storage (GWh) and double the storage power (GW) but much less than double the cost.

– Large W/R ratio (>10). A site with double the ratio of the volume of stored water (W) to the volume of rock (R) needed to construct the reservoir walls translates to half-cost reservoirs.

– Large slope (>10%). Tunnels are expensive. Large ratio of head-to-spacing between the reservoirs (= slope) is strongly favoured. An aqueduct or low-pressure pipeline can often shorten the pressure tunnel. 

– Large scale (>40 GWh): a single 80 GWh PHES system is much more cost-effective than five 16 GWh systems. It’s cheap to make larger reservoirs to store more energy, by scooping up more rock to make higher dam walls.

– Long duration (>100 hours): a 160-hour PHES system (eg 80 GWh @ 0.5 GW) has ten times lower water and electron flow in the tunnel, pump/turbine and transmission compared with a 16-hour (80 GWh @ 5 GW) version using the same reservoirs, allowing much lower costs. A low-flow pressure pipeline could avoid tunnelling, and lower voltage transmission could be used. 

PHES is ten times cheaper than batteries for large-scale energy storage (GWh) while batteries are cheaper for high power (GW). Long duration (e.g. 160-hour) premium PHES as a hybrid with four hour batteries (located at grid strong points) combines large-energy, high-power, high-peak-period selling price and negative-cost recharging, by allowing storage to trickle-recharge storage as explained here.

Snowy 2.0 is Class AA with storage of 160 hours. Its long tunnel is offset by not having to build reservoirs. From 2028, it will provide 85% of NEM energy storage (350 GWh) at 10X lower capital cost ($34/kWh) than equivalent batteries and with five times longer lifetime. 

Selected premium (Class AA) sites are shown in the Table together with URLs for visualisation. All are outside national parks (except Snowy 2.0), and all have good access to local workforce, transmission, roads and water. For perspective, Australia needs about 1000 GWh of additional storage to fully decarbonise via electric-driven transport, heating, industry, metals, chemicals, and synthetic aviation fuel. 

However, most proposed Australian pumped hydro projects have combinations of small head (200-400m), small W/R (1-5), small slope (3-8%), small scale (8-18 GWh) and short duration (8-18 hours). Costs derived from such sites are poor guides to long duration Class AA sites.

Selected Class AA sitesSize (GWh)Head (m)W/RSlopeViewType
Townsville50-500490618%URLGreenfield
Mackay50-150800813%URLGreenfield
Tully50-150726511%URLBluefield
Ingham150-1500630186%URLGreenfield
Proserpine50-500600813%URLGreenfield
Stanthorpe50-15005411715%URLGreenfield
Belinger50-1507401712%URLGreenfield
Tenterfield50-5006401311%URLGreenfield
Tamworth50-15006121610%URLGreenfield
Armidale1505531010%URLGreenfield
Lithgow50-1500622177%URLGreenfield
Araluen50-5005391311%URLGreenfield
Talbingo & Blowering50-500584814%URLBluefield
Brown Mtn50-1500860169%URLGreenfield
Yallourn150446143%URLBrownfield
Great Lake Tasi150-5000850107%URLBluefield
Snowy 2.03506802.5%URLBluefield

Andrew Blakers is professor of engineering, Australian National University.

Andrew Blakers

Andrew Blakers is professor of engineering, Australian National University.

Share
Published by
Tags: pumped hydro

Recent Posts

How renewables and EVs can shield Australia from the economic fallout of Trump’s war

When conflicts affect global oil and gas routes, Australians feel it. But Australia has all the…

6 March 2026

Community battery launches next to community solar system, to help power regional resilience

Community focused retailer launches first of seven batteries to be deployed across regional Victoria and…

6 March 2026

Energy Insiders Podcast: The revolution in electric trucking

The Australian trucking industry is about to experience an electric revolution, with plunging battery prices…

6 March 2026

Solar farms hit by cuts to grid output ratings due to changes in energy flows, but some big batteries are happy

Latest grid ratings include bad news for solar farms in some areas, but a boost…

6 March 2026

Last panel goes up at first solar-battery hybrid project to connect to Australia’s main grid

Final panel installed at Australia's first large scale solar-battery hybrid facility to connect to the…

6 March 2026

Offshore wind project says it’s “fully prepared” as it heads into full environmental assessment

Plans to develop a 1GW wind farm in waters off the coast of Gippsland have…

6 March 2026