Solar

Jinko 460W “Tiger” solar module launched in Australia

Published by

JinkoSolar has launched a new, high efficiency solar panel onto the Australian market, offering up 460W generation capacity, and a module efficiency of just over 20 per cent.

The Chinese solar giant officially launched the new Mono PERC module at sideline event to the All-Energy Australia conference and exhibition in Melbourne on Wednesday.

Dubbed the Tiger, Jinko says it has been able to offer sunlight conversion efficiency of up to 20.78% due to the use half-cut cell design and its Tiling Ribbon technology.

“Our new Tiger module delivers significantly higher power output and an easy performance boost that doesn’t require much extra effort for customers to install,” said Kangping Chen, CEO of JinkoSolar,

“This is another step forward technologically for JinkoSolar and demonstrates our ability to innovate advanced technologies as we accelerate towards the era of grid parity.”

The launch comes just a couple of months after market competitor Longi launched its own new high efficiency module – also in Melbourne – with the Hi-MO X, offering up to 20 per cent efficiency.

Both the Longi and Jinko modules use DuPont’s Tedlar as the backsheet material, which automatically qualifies them for the relatively new MAST certification from Australia’s Clean Energy Council, that encourages quality product choices by distributors and installers.

JinkoSolar, meanwhile, last month pledged to source 70 per cent of its electricity needs with renewable energy by 2023, and 100 per cent by 2025.

To read the original story on RenewEconomy sister site One Step Off The Grid click here…

Sophie Vorrath

Sophie is editor of Renew Economy and editor of its sister site, One Step Off The Grid . She is the co-host of the Solar Insiders Podcast. Sophie has been writing about clean energy for more than a decade.

Share
Published by

Recent Posts

“Just give us a shot:” Networks say community batteries can right the wrongs of grid gold plating

Should networks be allowed to deliver competitive services like shared storage from community batteries? Rob…

22 April 2026

Solar Insiders Podcast: Community batteries – can networks deliver what it says on the tin?

Rob Amphlett Lewis on Ausgrid's Energy Storage as a Service offer, the falling cost of…

22 April 2026

Wind project to hand over worker village to First Nations community, and create new home for black cockatoos

Plans to build accommodation for 300 wind farm workers get federal environmental pass, with promise…

22 April 2026

First giant turbine parts for the only wind farm under construction in NSW to begin long road journey soon

Updated: First of 700 turbine deliveries for the only wind farm in NSW currently under…

22 April 2026

Hybridisation of wind, solar and battery storage is no longer optional – it’s the new baseline

Hybridisation is rapidly becoming the default model for utility-scale renewables. Not because it is elegant,…

22 April 2026

Video: From $200 bills to $190 credit – 1 month with solar & battery

After installing solar and battery storage in Part 1, this is the first real look…

22 April 2026