The Vendor of this opportunity was one of the pioneers is clean energy investment in Australia is putting up for expressions of interests (EOI) its 2 turbine wind farm – 2.50mins west of Sydney situated in an idyllic setttings of east of Oberon.
Hampton Wind Park was one of the early demonstration wind sites in Australia – confirming the potential for small scale embedded generation into the grid. Hampton deployed 2 Vestas V47 660Kw Wind Turbines – these machines have benefited from loving TLC O&M over their life – from an engineering perspective there is every reason this will continue.
The opportunity ideally suites a buyer with a vision to stamp, in a tangible way, their leadership in the net zero agenda – a demonstrable corporate identity -perhaps an opportunity to confirm commitment or credentials for the market or for clients in a close drive from Sydney . The site is ideally positioned for re-powering -it has produced on average 2.2 to 2.5GWh per annum – it is well positioned with available land for behind the meter ground mounted solar. So in addition to producing KWhs of wind energy explore your vision for this profile opportunity
Please forward brief EOI outlining your interest to hamptoneoi727@gmail.com or call Mark on 0414 827 129 – ( no tyre kickers please).
The latest survey into farming attitudes to renewables is that relationships with developers could use…
South Australia chooses supplier of the world-first hydrogen capable turbines to support its charge towards…
Indonesia, with the fifth biggest fleet of coal power plants in the world, vows to…
Environment minister Tanya Plibersek defends coal mine approvals as 170 people arrested for blockading world's…
Many people are disappointed by COP29. It did not bring transformative change. But it was…
Australia’s electricity system is physically decentralising, but the regulatory response is to extend the current…