Press Releases

Operations & maintenance contractors sought for Swan Hill solar farm

Published by

PRESS RELEASE

Impact Investment Group is seeking expressions of interest for an Operation and Maintenance (O&M) contract at the Swan Hill Solar Farm (VIC). IIG is targeting an initial 5-year O&M term with the option for a further 5 years.

The Swan Hill Solar Farm is a 19MWp-capacity plant approximately 2km west of the Swan Hill township. It reached practical completion in mid-July 2018.

The O&M services broadly required include:

  • Daily management and operation of the solar facilities
  • Preventative and corrective maintenance of the plants’ various systems, equipment and lands.
  • Remote Monitoring and Control of facility
  • Minor capital works if required
  • Compliance with applicable laws, regulatory approvals, permits and related agreements

Expressions of interest are due by 5pm, 5 April 2018.

The selection timetable and the criteria to be addressed are available here:

https://www.impact-group.com.au/wp-content/uploads/2019/03/SH-AM-EOI-OM-20190318.pdf

For further information, please contact

Rosie Bennett

Asset Manager – Renewable Energy Infrastructure

0425 754 367

rosie@impact-group.com.au

Share
Published by

Recent Posts

Climate Authority’s “misinformation” report hit a nerve at News Corp for a reason

Few organisations have so consistently campaigned to stymie climate action – possibly anywhere on the…

4 September 2026

Energy Insiders: Zero carbon heat, Australia’s next big challenge

Tom Geiser from Good Heat on the technologies to provide carbon-free industrial heat. Plus: LNP's…

4 September 2026

Australia’s climate hypocrisy on show as world braces for global warming “overshoot”

Days apart, one Australian minister called for reduced dependence on fossil fuels, while another literally…

4 September 2026

Gigawatt-hour battery plan edges closer to construction as Swiss giant takes full ownership of site

Swiss storage giant completes purchase of the project site for big four-hour battery, setting a…

4 September 2026

“Golden turbine” complete, in huge milestone at rare state-owned wind farm

Installation of the "golden" turbine is being hailed as a "huge milestone" for a wind…

4 September 2026

Can you run a paper mill on solar and “hot bricks”? Visy says it can – on paper, at least

A paddock of solar and an innovative converter could allow Visy to cut gas use…

4 September 2026