Storage

Massive and unprecedented injection of power as Super Battery tests its full shock-absorber capacity

Published by

The Waratah Super Battery – the country’s most powerful – has injected a massive and unprecedented amount of power into the grid over a two hour period in what appears to be the first full testing of its capacity to act as a “shock absorber” to the grid.

The Waratah battery, rated at 850 megawatts (more than any other battery in the country) and 1,680 megawatt hours – has a 5.5 year contract to deliver up to 700 MW of this capacity under the state government’s System Integrity Protection Scheme.

Essentially this serves as a backstop, or shock absorber, that allows transmission lines to run at greater or even full capacity, which is critical to the transport of renewables and other power sources in an increasingly decentralised grid.

Similar but smaller SIPS contracts are in place in Victoria and South Australia, but none that comes anywhere near the scale of Waratah.

The contract was supposed to be delivered earlier last year but construction delays and then a “catastrophic” failure in one of its three transformers late last year, and damage to another, meant that only half the required capacity could be delivered until now.

That may soon change, however, following the repair of one of the transformers that was completed in June and the arrival and energisation of a new transformer last week, as reported by Renew Economy.

Screenshot

On Monday, as we reported, the Waratah battery sent its maximum 850 MW into the grid for a brief five minute period, as part of ongoing tests, but on Wednesday morning it injected at least 700 MW over a two hour period (see graph above from Open Electricity).

That is more than has been injected over a sustained period by any other battery until now, and Renew Economy understands this was a key test of its ability to deliver on the SIPS contract.

That contract – which also involves the Metz solar farm, Sapphire wind farm and Tumut pumped hydro projects acting as “paired generators” – requires Waratah to provide 700 MW of capacity if needed at certain times, and smaller amounts at other times.

The “sculpted” nature of the contract allows Akaysha Energy, the owner of the Waratah battery, to use its formidable capacity to play in the wholesale market at times, although it appears certain that the bulk of its short term revenues will come from the SIPS contract.

To join more than 29,000 others and get the latest clean energy news delivered straight to your inbox, for free, click here to subscribe to our free daily newsletter.

Giles Parkinson is founder and editor-in-chief of Renew Economy, and founder and editor of its EV-focused sister site The Driven. He is the co-host of the weekly Energy Insiders Podcast. Giles has been a journalist for more than 40 years and is a former deputy editor of the Australian Financial Review. You can find him on LinkedIn and on Twitter.

Giles Parkinson

Giles Parkinson is founder and editor-in-chief of Renew Economy, and founder and editor of its EV-focused sister site The Driven. He is the co-host of the weekly Energy Insiders Podcast. Giles has been a journalist for more than 40 years and is a former deputy editor of the Australian Financial Review. You can find him on LinkedIn and on Twitter.

Share
Published by

Recent Posts

“Monumental”: Key renewable energy road routes get $1.28 billion injection from NSW, federal governments

NSW and federal governments are tipping in more than $1 billion to improve roads, with…

7 October 2026

Construction begins on wind farm and big battery to power huge mine and push state closer to 100 pct renewables

Construction begins at new wind and battery project that will help power one of world's…

7 October 2026

Owner of state’s biggest wind farm wants to add an even bigger facility next door, with a very big battery

The owner of the biggest wind farm in W.A. unveil plans for an even bigger…

7 October 2026

Ageing, cyclone-proof “tilt up” wind turbines to be replaced at edge of coral paradise

The ageing cyclone proof wind turbines were the first "tilting" turbines in the state, and…

7 October 2026

French energy giant seeks federal green tick for wind farm and big battery in hotly contested zone

The Australian arm of a French energy giant is seeking federal environmental approval to build…

6 October 2026

Rooftop PV system sizes are shrinking in line with battery rebates, but it’s still a bumper year for home solar

Rooftop solar uptake has ridden the wave of Cheaper Home Batteries, but new data shows…

6 October 2026