Press Releases

JinkoSolar wins the 5th All Quality Matters Award from TÜV Rheinland

Published by

PRESS RELEASE

SHANGHAI, Apr 17, 2019 — JinkoSolar Holding Co., Ltd. (“JinkoSolar” or “Company”), (NYSE code JKS), a reputable solar module manufacturer in the world, today announced it won the 5th All Quality Matters Award for PV Module Energy Yield Simulation (Mono Group) at the Solar Congress 2019 organized by TÜV Rheinland.

The careful evaluation of energy yield simulation is based on performance testing of samples randomly selected from mass production under global conditions that range from irradiance of 100-1100W/m2 and temperatures of 15-75°C. JinkoSolar ranked first in testing conducted for the mono group and was recognized for outstanding energy yield and its high quality standards.

Solar panels’ quality is the key to ensure the real electricity output in the field and secure PV project investment. A low-quality solar panel will meet a series of module failures like micro-cracks caused by the vibration during transportation, and backsheet failures caused by ambient humidity or ultra-violet radiation, reducing significantly the power output in the actual operating condition. When the module failure occurs, EPCs will need to shut down the whole string to replace the failed solar module, which takes several days or months depending on the supplier’s response speed. During the downtime, the entire string will not be able to generate electricity, dragging down the investment return.

Independent third-party testing report plays an important role in benchmarking the reliability performance of a solar panel. DNV GL performs ageing tests at a more stringent standard than the IEC certificate, in order to highlight the ultimate reliability performance under the extreme outdoor conditions. DNV GL scorecard shows that only a few Tier-1 suppliers have passed all the 5 test items to become the Top Performer, while JinkoSolar has been the Top Performer for four consecutive years since 2014.

The reports and tests from all reputable third-parties including TÜV, DNVGL, IEC, CEC, and more highlight JinkoSolar’s commitment to consistently deliver reliable PV modules as the foundation of the 25-year solar project investment.

About JinkoSolar Holding Co., Ltd.

JinkoSolar (NYSE: JKS) is one of the world’s largest and foremost solar module manufacturers. JinkoSolar distributes its solar products and sells its solutions and services to a diversified international utility, commercial and residential customer base in China, the United States, Japan, Germany, the United Kingdom, Chile, South Africa, India, Mexico, Brazil, the United Arab Emirates, Italy, Spain, France, Belgium, and other countries and regions. JinkoSolar has built a vertically integrated solar product value chain, with an integrated annual capacity of 9.7 GW for silicon wafers, 7.0 GW for solar cells, and 10.8 GW for solar modules, as of December 31, 2018.

JinkoSolar has over 12,000 employees across its 6 productions facilities globally, 15 oversea subsidiaries in Japan, Korea, Singapore, India, Turkey, Germany, Italy, Switzerland, United States, Canada, Mexico, Brazil, Chile, Australia and United Arab Emirates, and global sales teams in United Kingdom, France, Netherlands, Spain, Bulgaria, Greece, Romania, Ukraine, Jordan, Saudi Arabia, Tunisia, Egypt, Morocco, Nigeria, Kenya, South Africa, Costa Rica, Colombia, Panama and Argentina.

Share
Published by

Recent Posts

Australia’s biggest coal state breaks new ground in wind and solar output

New South Wales has reached two remarkable renewable energy milestones that signal the growing contribution…

6 January 2025

New Year begins with more solar records, as PV takes bigger bite out of coal’s holiday lunch

As 2025 begins, Victoria is already making its mark on the energy landscape with a…

3 January 2025

What comes after microgrids? Energy parks based around wind, solar and storage

Co-locating renewable generation, load and storage offers substantial benefits, particularly for manufacturing facilities and data…

31 December 2024

This talk of nuclear is a waste of time: Wind, solar and firming can clearly do the job

Australia’s economic future would be at risk if we stop wind and solar to build…

30 December 2024

Build it and they will come: Transmission is key, but LNP make it harder and costlier

Transmission remains the fundamental building block to decarbonising the grid. But the LNP is making…

23 December 2024

Snowy Hunter gas project hit by more delays and blowouts, with total cost now more than $2 billion

Snowy blames bad weather for yet more delays to controversial Hunter gas project, now expected…

23 December 2024