Solar

Japanese renewable investor lands financing deal for small Victoria solar farm

Published by

Japanese based renewable energy developer Bison Energy says it has reached financial close for a small 5MW (ac) solar farm in Victoria after landing a deal with a local superannuation fund.

The Cosgrove solar farm, near Shepperton, is one of nine small solar projects being developed by Bison Energy, and recently gained planning approval from the Victorian Department of Environment, Land, Water and Planning (DELWP).

Planned to be built in the small northern town of Cosgrove, 20-kilometres east of Shepparton, the 17-hectares (below) for the solar farm have been leased from the current landowner/farmer for 30 years.

The Cosgrove Solar Farm is part of a growing portfolio of around 50MW worth of small scale solar farms owned by Bison Energy Group in Victoria and New South Wales, all of which are in various stages of development.

In addition to its Australian assets, Bison Energy Group also boasts a portfolio which stretches across Europe and Easter Asia.

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Joshua S Hill

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Share
Published by

Recent Posts

Solar Insiders Podcast: Is ultra-cheap PV still within reach?

Arena's head of solar, Dan Sturrock, on the agency's progress towards the 30-30-30 target as…

15 October 2026

“Playing catch-up:” Sunshot targets cheaper construction in quest for ultra-low cost solar

Arena says the pursuit of ultra-low cost solar is making "good progress" at the panel…

15 October 2026

Long lead times for syncons, gas turbines complicate energy market transition, major supplier says

Gas turbines aren't the only large equipment with long lead times.

14 October 2026

Why the old tradie business model won’t deliver all-electric homes | SwitchedOn Australia

All Electric Homes founder Trent Jones warns that a shortage of skilled tradies, fragmented business…

14 October 2026

Webinar: Hard-earned lessons for BESS operators – warranties, diagnostics, and contract design

For asset owners, buyers, managers and O&M teams, the webinar will cover performance metrics, service…

14 October 2026

Commissioning starts on what will be state’s biggest battery – but not for long

Less than two years after starting construction, four-hour big battery energy storage system powers up…

14 October 2026