Is bigger always better when it comes to solar modules?

Published by

Large scale solar developers in Australia are starting to explore new, larger, module sizes in their installations. There are now many large modules on the market. But is bigger always better?

A large scale PV power plant not only delivers consistent green energy, but is also a significant financial investment over 25 years. Long term reliability and return on investment are critical factors in any project.

In Australia, many of these solar plants must operate in sometimes remote regions and deal with
harsh conditions.

A PV module needs to be able to operate in different types of extreme weather conditions and increasing the size of modules too far has the potential to introduce significant additional risk to power plants.

In Australia hail can be incredibly damaging to solar installations affecting efficient operation and return on investment.

Solar panels utilise a glass covering to ensure maximum light reaches the solar cells to generate electricity, this creates an obvious weakness and so no modules available on the market in Australia currently warrant against damage to modules under extreme hail conditions.

To reassure customers LONGi sent their new Hi MO-5 modules to TÜV SÜD, an independent testing and verification centre, to see how well they perform. The TÜV SÜD report demonstrates that Hi-MO 5 was successful in passing a 35mm hail impact test.

Caption: Results from TÜV SÜD hail testing of LONGi HI MO-5 modules
Results from TÜV SÜD hail testing of LONGi HI MO-5 modules


Alongside this test from TÜV SÜD, LONGi internal laboratories have rigorously tested the Hi-MO 5 module (based on a 182mm wafer with dimensions of 2256×1133mm, 2.56m2) against a standard oversized module (dimensions 2384×1303mm, 3.11m2) currently available. This hail performance test exposes some issues in modules that are too large.

Share
Published by

Recent Posts

Six wind farms, two solar hybrids and seven-hour batteries win key CIS tenders ahead of coal closure

Six wind farms, two huge solar-battery hybrids and several seven and eight hour battery projects…

2 May 2026

Huge wind and battery project becomes first to seal local benefits deal under rigorous new planning regime

Developer thanks council for helping navigate "evolving regulatory landscape" as it seals the first Community…

2 May 2026

“Let’s actually get projects up and running:” Report warns Australia’s green iron edge is at risk

Australia's renewable energy and rich iron ore deposits make it a potential leader in green…

1 May 2026

New changes trim “essential” REZ transmission route to avoid caves – and another 50 landholders

A new nip-and-tuck to plans for a major new REZ transmission line has trimmed it down…

1 May 2026

Energy Insiders Podcast: Electric trucks are profitable, but diesel struggles

Ben Hutt, the CEO of battery-swap electric truck company Janus Electric on the switch from…

1 May 2026

Claims of huge new blow-outs to the Snowy 2.0 bill are just plain wrong

The latest, much-inflated price estimates Snowy 2.0 critics have come up with for the pumped…

1 May 2026