The Vendor of this opportunity was one of the pioneers is clean energy investment in Australia is putting up for expressions of interests (EOI) its 2 turbine wind farm – 2.50mins west of Sydney situated in an idyllic setttings of east of Oberon.
Hampton Wind Park was one of the early demonstration wind sites in Australia – confirming the potential for small scale embedded generation into the grid. Hampton deployed 2 Vestas V47 660Kw Wind Turbines – these machines have benefited from loving TLC O&M over their life – from an engineering perspective there is every reason this will continue.
The opportunity ideally suites a buyer with a vision to stamp, in a tangible way, their leadership in the net zero agenda – a demonstrable corporate identity -perhaps an opportunity to confirm commitment or credentials for the market or for clients in a close drive from Sydney . The site is ideally positioned for re-powering -it has produced on average 2.2 to 2.5GWh per annum – it is well positioned with available land for behind the meter ground mounted solar. So in addition to producing KWhs of wind energy explore your vision for this profile opportunity
Please forward brief EOI outlining your interest to hamptoneoi727@gmail.com or call Mark on 0414 827 129 – ( no tyre kickers please).
Renewables met more than 80 per cent of total grid demand for first time on…
A new Consumer Energy Resources Technical Code will define the standards and capabilities required of…
Australian businesses looking to ditch gas and diesel can do the sums, find electrification will…
An abundance of rooftop solar generation has helped set a new record high for the…
Windlab's John Martin on the project that broke the investment drought for big wind, and…
Federal Labor's determination to power new data centres with renewables, and to minimise emissions and…