Press Releases

Entura develops pumped hydro atlas of Australia

Published by

PRESS RELEASE

Specialist power and water consulting firm Entura has been engaged by Hydro Tasmania to develop a practical atlas of pumped hydro energy storage opportunities to support development of dispatchable renewable energy generation.

The atlas has already been applied to inform and enable Hydro Tasmania to shortlist potential pumped hydro sites for the ‘Battery of the Nation’ program in Tasmania.

Completed in October 2017, the Pumped Hydro Atlas of Australia identified more than 5000 unique potential sites across Australia’s National Electricity Market (NEM) to enable greater penetration of renewables in the country.

“The Pumped Hydro Atlas of Australia produced by Entura is a real-world, relevant resource informing future project development,” said Dale Bryce, Entura’s Director of Customer Strategy and Market Development.

“To determine the best possible sites, our analysis took into account not only topographical suitability, but also considered all the practical factors involved in creating a viable and successful project.”

Following an exhaustive process, twenty promising sites were shortlisted for different states with a desktop review of geology, high-level engineering arrangements, and approvals requirements.

For each site a map was prepared including locality, land use, planning zones, and key characteristics of the potential project.

Mr Bryce explained that pumped hydro energy storage has the potential to generate rapid response, flexible power for delivery into the NEM. “It’s a highly efficient form of large-scale energy storage that could help mitigate challenges that may come with the introduction of more renewables into the market.”

“Overlaying the outputs of this atlas with any new wind and solar development across the NEM could identify viable dispatchable renewable energy generation hubs with the potential to replace retiring thermal generation assets.”

Entura has completed the Technical Feasibility Study for Genex Power’s Kidston Pumped Storage Hydro Project in Queensland and is currently supporting pumped hydro project proponents in South Australia, as well as continuing to support the ‘Battery of the Nation’ program.

The firm has also been involved in a number of wind, solar and hybrid renewables projects in Australia and internationally, supporting development, grid integration and connection studies.

Entura has worked with clients in more than 30 countries over the past few decades – including India, Laos, Malaysia, Papua New Guinea, South Africa and Uganda – assisting with developing, operating and maintaining hydropower assets of all sizes.

Share
Published by

Recent Posts

Australia’s best performing wind and solar farms in October

Best performing wind farms split between north, south, east and west, but the solar results…

3 November 2024

Developers quietly shed solar generation to focus on battery only projects

Developers are cutting generation from their projects and going with a battery-only approach. Solar is…

3 November 2024

Australia reaches record monthly renewable share of 47.4 per cent, and poised to leap further ahead

Australia's main grid reached a record renewable share of 47.4 pct for October, while in…

3 November 2024

Energy Insiders Podcast: How to replace gas

The gas industry says we need more of the fossil fuel to prosper. Jarrod Leak,…

1 November 2024

Queensland LNP names new energy minister, nixes massive pumped hydro project

Queensland LNP to combine treasurer and energy minister role, as it moves quickly to stop…

1 November 2024

More records tumble as renewables hit new high and coal a new low

Rooftop solar propels renewables to a new record share of the main grid, and pushes…

1 November 2024