Storage

Construction starts on new big battery in place of gas unit in another major shift from baseload

Published by

French energy company Engie has announced the start of construction of a new big battery sited next to its biggest gas generator in South Australia, in a further sign of the rapidly changing dynamics of the grid and the shift from conventional “baseload” power.

The 200 megawatt (MW), 400 megawatt hour (MWh) Pelican Point battery will be built next to the 489 MW Pelican Point gas fired generator, which has already been partly converted to an open cycle turbine for faster starts and more flexibility in the world’s most advanced renewable grid.

South Australia leads the world in the integration of wind and solar with an average of 75 per cent over the last 12 months, and aims to reach 100 per cent net renewables by the end of 2027.

It already has eight big batteries in operation, and another dozen in construction and commissioning, and gas power at times has been relegated to a minor role – providing just a single turbine at times of high wind and solar share to ensure essential grid services.

Engie had originally set aside the land where the battery will be built for another big gas unit, but the plunging price of battery storage, and the need for more flexibility, meant it chose to build a big battery instead, as Alinta has also done at the Reeves Plains project in South Australia.

Engie Australia’s managing director of renewables and batteries, Laura Caspari, says co-locating large batteries with existing or former thermal power sites is one of the keys to accelerating Australia’s energy transition.  

“Developing BESS projects at our sites leverages existing infrastructure, minimises environmental impacts, and ensures we can deliver reliable, flexible energy solutions at speed,” she said in a statement.

“This supports the rapid integration of renewables and creates future-ready energy hubs.”

Engie has already hosted the 150 MW, 150 MWh Hazelwood battery at the site of the shuttered brown coal generator in Victoria’s Latrobe valley and has expansion plans for that facility.

But the development of Pelican Point also highlights the rapidly falling cost of battery storage in a world where technology costs of most other energy infrastructure and fossil fuel source is rising.

Engie says the Pelican Point battery will use Sungrow technology, with Elecnor and ElectraNet looking after construction and connections. The battery is expected to be commissioned in the second half of 2027.

The project will create around 250 jobs during the construction phase and will boost Engie’s retail activities in the state. Engie says it has committed to providing up to $30,000 per year to a dedicated Community Benefit Fund for the life of the operating asset. T

See also Renew Economy’s Big Battery Storage Map of Australia for more information.

If you would like to join more than 28,000 others and get the latest clean energy news delivered straight to your inbox, for free, please click here to subscribe to our free daily newsletter.

Giles Parkinson is founder and editor-in-chief of Renew Economy, and founder and editor of its EV-focused sister site The Driven. He is the co-host of the weekly Energy Insiders Podcast. Giles has been a journalist for more than 40 years and is a former deputy editor of the Australian Financial Review. You can find him on LinkedIn and on Twitter.

Giles Parkinson

Giles Parkinson is founder and editor-in-chief of Renew Economy, and founder and editor of its EV-focused sister site The Driven. He is the co-host of the weekly Energy Insiders Podcast. Giles has been a journalist for more than 40 years and is a former deputy editor of the Australian Financial Review. You can find him on LinkedIn and on Twitter.

Share
Published by

Recent Posts

“Significant shift:” How batteries are capping electricity prices and helping to bust the energy market cartel

A near tripling of installed battery capacity and increasingly diverse ownership of solar and wind…

20 August 2026

ACT losing climate urgency as Labor governs alone, ex-Greens energy minister Shane Rattenbury says

Former Greens energy minister Shane Rattenbury says the ACT government is losing its climate urgency…

19 August 2026

“They are not locked in:” Inside the anti-renewables meeting and wild claims about migrant workers

Residents near camps housing construction workers for a Renewable Energy Zone have been told to…

19 August 2026

It’s time for a plug-in revolution: The harsh reality of trying to drive electrification and PV for apartments

We must focus on consumer-side of the meter efficiency, energy storage and smart management. This…

19 August 2026

“We need more gas:” Victoria Coalition light on detail after vowing to scrap VNI West transmission link

Victoria's Coalition is accused of tossing away years of planning by farmers and communities with…

19 August 2026

Twiggy Forrest’s Squadron Energy seeks retail licence to sell renewable electricity to select businesses

Andrew Forrest's Squadron Energy seeks a licence to retail electricity to business and industry in…

19 August 2026