Connected Energy and Renault are partnering together for the creation of second-life electric vehicle battery energy storage technologies, the first of which, the E-STOR technology, will be available for purchase in the UK starting in July, according to recent reports.
This first offering is a 50 kilowatt/50 kilowatt-hour (kW/kWh) product created out of old Renault electric vehicle (EV) batteries. Given the size of the battery, a number of applications are possible — including the support of EV fast charging stations in locations without direct access to high electricity supply rates.
Considering that EV batteries still possess a lot of energy storage capacity even after ending their working first-life in an EV, the partnership makes a lot of sense — why not reuse the batteries as much as possible before recycling?
Green Car Congress provides more information on the technology:
With increasing EV sales — 97,687 EVs were sold in Europe in 2015, up 48% on 2014 — so is the requirement in energy to charge them. Connected Energy is addressing both issues through use of second-life EV batteries in its E-STOR technology.
This can be used, for example, to store energy generated from on-site renewable generation resources such as solar panels and wind turbines, and then release it as needed at a later time. The system also allows the batteries to be charged via low-cost off-peak electricity tariffs, enabling users to reduce their energy costs.
The Connected Energy E-STOR EV second-life energy storage technology was named as the winner of the innovation category in the British Renewable Energy Awards 2015, last June.
Source: CleanTechnica. Reproduced with permission.
China solar giant launches powerful new all-black solar module that targets premium market and “pushes…
Plans to build one of the world's biggest industrial heat battery projects win Arena funding,…
Board of Queensland energy utility says it needs new leadership, and asks 28-year company veteran…
How do regenerative land practices make renewable energy more reliable? How does government policy reward…
Developer of nearby big battery project offers up to 75 positions to sacked Whyalla Steel…
A 4.99 MW project is attracting the usual fears about the visual impact in a…