Wind

Wind turbines pay back life cycle carbon emissions in less than 2 years, NZ study finds

Published by

Wind turbines in New Zealand pay back their lifecycle carbon emissions after just 1.5 years of operation, researchers from Victoria University in Wellington have found.

The researchers looked at data from a Hawkes Bay wind farm covering everything from making individual turbine parts, to transporting them into place, to decommissioning the entire windfarm, and compared that to combined cycle gas turbines. 

To add insult to thermal injury, the researchers also found that it takes a wind turbine just six months to generate the equivalent of all of the energy required to make it, set it up, and take it down at the end of its life. 

The payback period was calculated by looking at avoided emissions from grid electricity and from gas turbines, as in New Zealand onshore wind tends to displace energy generated by the former.

The new research used data from Meridian Energy’s under-construction Harapaki Wind Farm, which when finished will have 41 turbines and 176 megawatts (MW) of installed capacity. 

It found that literature data consistently overestimates emissions created by civil works, and underestimates those during the transportation phase for onshore wind farm carbon footprints.

“The outcomes underscore the environmental efficiency of onshore wind farms and their important role in the energy transition. Notably, the manufacturing of wind turbines is the primary contributor to the carbon and energy footprints, highlighting a critical area for targeted environmental mitigation strategies,” the study says.

New Zealand has long been a big installer and user of wind energy since 1993 when deployment began. By 2023 installed capacity reached 1.3 gigawatt (GW) from 21 farms, with an average capacity factor across the country of 41 per cent – almost double the global average. These supply 12 per cent of the country’s power needs.

Another 2.2 GW of onshore generation is currently in different stages of planning and approvals, according to the New Zealand Wind Energy Association.

“Manufacturing wind turbines has been reported as the major contributor to greenhouse gas (GHG) emissions,” said the paper, published in the Journal Of The Royal Society Of New Zealand.

“However, the results in the literature for the carbon footprint of onshore wind plants vary from 3.3 to 70 gCO2eq/kWh, influenced by different factors such as technology employed, power plant capacity, turbine nominal capacity, site location, and temporal analysis resolution.”

The variations mean there’s little agreement on just how large a wind farm’s carbon footprint is, particularly since fewer Life Cycle Assessment studies have looked at the larger wind turbines now favoured by developers.

This paper delves into construction and recycling, two areas that previous studies have not tended to focus on.

“Both mechanical and chemical recycling methods show potential environmental benefits, reducing the overall wind farm GHG emissions from 10.8 (landfill) to 10.3 and 9.7 gCO2eq, respectively,” the paper says. 

“However, it is crucial to note that these recycling technologies are not yet commercially feasible, and mechanical recycling presents the most mature option.”

Rachel Williamson is a science and business journalist, who focuses on climate change-related health and environmental issues.

Rachel Williamson

Rachel Williamson is a science and business journalist, who focuses on climate change-related health and environmental issues.

Share
Published by

Recent Posts

What comes after microgrids? Energy parks based around wind, solar and storage

Co-locating renewable generation, load and storage offers substantial benefits, particularly for manufacturing facilities and data…

31 December 2024

This talk of nuclear is a waste of time: Wind, solar and firming can clearly do the job

Australia’s economic future would be at risk if we stop wind and solar to build…

30 December 2024

Build it and they will come: Transmission is key, but LNP make it harder and costlier

Transmission remains the fundamental building block to decarbonising the grid. But the LNP is making…

23 December 2024

Snowy Hunter gas project hit by more delays and blowouts, with total cost now more than $2 billion

Snowy blames bad weather for yet more delays to controversial Hunter gas project, now expected…

23 December 2024

Happy holidays: We will be back soon

In 2024, Renew Economy's traffic jumped 50 per cent to more than 24 million page…

20 December 2024

Solar Insiders Podcast: A roller coaster year in review – and the keys to a smoother 2025

In our final episode for the year, SunWiz's Warwick Johnston on the highs and the…

20 December 2024