Welcome to Tesla Town: the new Melbourne suburb with a Powerwall in every home

Published by

One Step Off The Grid

Less than six months after Australia received its first shipment of Tesla Powerwalls, plans for what could be the world’s first “Tesla town” – a mini-suburb on the outskirts of the Melbourne CBD whose new-build homes will include rooftop solar and Tesla battery storage as standard design features – are being unveiled by local property group Glenvill, as the green development’s first 60 homes go on sale this week.

The new 16.46 hectare suburb, which will be called YarraBend for its 300 metres of Yarra River frontage, will include around 2,500 new dwellings – a mix of free standing houses, townhouses and apartments with three to five bedrooms, ranging in price from $1.48 million to $2.1 million.

The project is being designed, developed and built by Glenvill, which bills it as a “world first Tesla suburb” for its inclusion “within houses” of the iconic US company’s sleek-looking 7kWh lithium-ion Powerwall batteries, presumably to store energy from the houses’ rooftop solar systems, the sizes of which are not yet disclosed.

Houses in the development will also feature electric car recharging points, while residents will have access to high-speed internet, a “tech-concierge”, and a YarraBend app, that will connect them to a variety of amenities and information within the community, including public transport timetables, home delivery menus, carpooling arrangements and social events.

Just how many Powerwalls will be installed at YarraBend is not yet clear, but going by the estimated number of dwellings, it could number in the thousands. One Step Off The Grid has sought more information from Glenvill on the estimated number of battery installs, as well as the size range of the rooftop solar systems, and will update the story with any new information once we have it.

In previous comments, however, Glenvill sales and marketing manager Nick Marinakis has stated that the solar and storage on the homes, combined with green building design and energy efficient lighting and appliances, will see YarraBend achieve a 6-star ecologically sustainable development (ESD) rating – a first for an infill development site in Melbourne.

Danni Addison, the Victorian chief executive of the Urban Development Institute of Australia, which developed the ESD rating system, says the project is one of the most environmentally sustainable developments in Australia, with a water reduction of 43 per cent, landfill reduced by 80 per cent and the potential to reduce energy use by 34 per cent.

“The Powerwalls, combined with solar panels (also standard), will mean that future residents will be able to benefit in a variety of ways, including dramatically smaller power bills and knowing that the majority of their energy usage is coming from a clean and renewable source,” Addison told the Heidelberg Leader.

“The electric car charging points will be another available option,” she said. “Combined with the Powerwall and solar panels, it is likely that ‘refuelling’ future residents’ electric cars will be free.”

Marinakis says that official contract signing for the houses is expected to begin in August, with residents expected to begin moving in by late 2017.

The site – which previously housed the Alphington paper mill – could accommodate almost 5000 people, which would effectively double that suburb’s population of 4600, as per the 2011 Census.

Source: RenewEconomy’s sister publication One Step Off The Grid. You can sign up to the weekly newsletter here.

Sophie Vorrath

Sophie is editor of Renew Economy and editor of its sister site, One Step Off The Grid . She is the co-host of the Solar Insiders Podcast. Sophie has been writing about clean energy for more than a decade.

Share
Published by

Recent Posts

Victoria will have higher electricity prices and more gas without VNI West

ITK modelling suggests that without VNI West, Victoria will build and consume more gas and,…

4 November 2026

Why climate action could be a winner of the US “blunami,” even if it wasn’t a high priority for voters

Democrats have achieved mid-term success beyond their wildest hopes of a few months ago. But…

4 November 2026

Singapore wants to send us its carbon pollution, and Australians will be left holding the bill

Australia is negotiating a deal to import carbon dioxide from Singapore and store it offshore. We…

4 November 2026

Gas plant worker support package tussle a test case for net zero laws – and a “just transition”

A union fight for $3.3 million in support packages for workers caught up in a…

4 November 2026

“That’s no yacht!” Fortescue celebrates Australia-first green ammonia bunkering of very big iron ore ship

An ammonia-powered dry bulk vessel has successfully been supplied with certified green ammonia from a…

4 November 2026

“Serious omission:” Report says consultant advised government and industry on gas policy – and didn’t declare it

Consultancy under fire for providing advice to both the government and the fossil gas industry…

4 November 2026