Volkswagen Commercial Vehicles has presented the e-Bulli, bringing the T1 Samba into the electric era to celebrate the classic Kombi bus’s 70th anniversary.
Originally intended to be revealed at a world premiere at the German Techno-Classica 202 event in late March, an event now postponed due to Covid-19, the e-Bulli has now been revealed online by German car-builder and VW partner eClassics.
Based on a 1966 T1 Samba bus from 1966, the e-Bulli with 61kW electric motor takes things up a notch from the original 32kW 4-cylinder boxer engine that offered 102Nm torque.
The new electric motor instead delivers 212Nm torque and the ability to whip along at a top speed of 130 km/hr.
In the vein of original Kombis, the e-Bulli does not have the swift acceleration of sleeker electric models like Tesla electric vehicles, but it has the better of the original combustion engine version, which had a top speed of 105 km/hr.
A pleasant side effect of course is that thanks to the electric drive, the ride is significantly quieter.
Energy is supplied by a 45kWh lithium-ion battery, which is housed in the vehicle floor. According to the manufacturer, the e-Bulli can drive up to 200 kilometres on a single charge.
Because a CCS charging socket is used, the T1 can be charged both at DC fast charging stations as well as via a standard powerpoint, home “wallbox” or AC “destination” charger.
This means the e-Bulli can be recharged from 0-80% on DC fast charging stations with a charging capacity of up to 50kW in 40 minutes.
The interior has also been revised – even if this is not obvious at first glance. The seats for a total of eight people have been adapted to the two-tone paintwork, instead of an ignition lock there is now a start-stop button.
To read the full version of this story – and view the photo gallery – on RenewEconomy’s electric vehicle dedicated site, The Driven, click here…
Second stage of huge Supernode battery project starts operations, making it the biggest battery in…
Voters in Victoria are angry about the rising cost of living. But One Nation will…
Some stakeholders have used CSIRO's No Progress GenCost scenario to argue net zero should be…
Support for renewables is not where it needs to be to get the energy transition…
Energy and climate experts say Labor's plan for a third oil refinery in Australia makes…
Queensland state owned utility signs first major PPA since election of LNP government two years…