Solar

Tindo signs five-year deal to export Australian made solar panels to Vietnam

Published by

Australian solar panel manufacturer Tindo Solar says it has secured a five-year deal to export its solar panels to Vietnam.

Tindo announced on Wednesday that it had signed an agreement worth $8.4 million with Thanh Do Australia, the local subsidiary of Vietnam’s Thanh Do Construction Group.

The agreement will see Tindo supply 15MW worth of high-quality solar panels to large projects in Vietnam through Thanh Do, which is involved in infrastructure, real estate development, and clean energy projects across Vietnam.

A first shipment of Tindo 430W rooftop solar panels, made at the company’s Mawson Lakes facility in South Australia, is expected to be shipped to Vietnam this month.

To put that into perspective, the 15MW Sunshine Coast solar farm, which has been operating since 2017, consists of 57,960 315W solar panels, while the 15MW solar farm at the Kennedy Energy Park in Queensland is made up of 55,680 345W and 350W solar panels.

This latest deal is the longest export agreement that Tindo has signed and will run for five years. All solar panels shipped come with a 25-year product warranty and cyclone rated.

“This five-year agreement is a vote of confidence in Tindo’s employees, and in Australian manufacturing’s ability to succeed at the premium end of a very competitive market,” said Richard Petterson, CEO of Tindo.

“Tindo internally invests in R&D and engineering to ensure we produce a solar panel that always outperforms the market. Australians are prepared to pay slightly more for a high-quality panel, and we’ve identified the same premium market in other territories such as Vietnam.”

A further “vote of confidence” for Tindo was announced last month when Choice, the Australian Consumers’ Association, ranked Tindo solar panels as the best-performing module in Australia, and the only solar panel tested that matched or exceeded its specified power output.

Of the 15 rooftop solar panels Choice tested, only Tindo’s 410W Karra scored an ‘Excellent measured power output’ rating, achieving an overall 92% ‘Choice Expert Rating’ in front of the 80% Choice Expert Rating scored by the second-placed panel.

“With a workforce of sixty people, we design and build a solar panel that competes with the best in the world,” said Richard Petterson.

“Choice’s recognition of our panel is a great outcome for the company and for the customers who invest in an Australian-made, premium product.

“Tindo makes a significant investment in its R&D program, and we run an in-house engineering team that is constantly working on product improvements and upgrades. The panel that gained the Choice accolade is the eighth generation of solar panel produced by Tindo since the company made its first solar panel in 2011.”


Want the latest clean energy news delivered straight to your inbox? Subscribe to our free daily newsletter.

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Joshua S Hill

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Share
Published by

Recent Posts

Cows and cyclones: New push to design solar farms for cattle and climate, but is Australia ready?

Companies are looking again at how to put more farmland under solar without disrupting operations…

5 November 2026

Data centre probe prompts call for tighter renewable energy requirements in coal state

A NSW parliamentary inquiry has recommended the government require data centres to supply their own…

5 November 2026

Low-cost green hydrogen hopeful lands fresh grant to build pilot at site of proposed offshore wind hub

Green hydrogen CSIRO spin-off wins new grant funding to build fourth pilot plant, this time…

5 November 2026

The rise and fall of the LGC market and the data centre policy decision that will determine its fate

A seemingly niche decision around data centre standards will determine whether LGC prices retain some…

5 November 2026

Huge wind and battery project avoids turbine cuts and name change to win state approval for the West

Developer dodges having to cut 18 turbines from its 750 MW wind plans and change…

5 November 2026

State tightens reins on home energy saver loans after signing up 15,000 households in just 5 months

Energy efficiency is so hot right now. After signing up more than 15,000 households to…

5 November 2026