Electric Vehicles

Tesla Roadster takes on gas-guzzlers at Targa West rally in Perth

Published by

As engines fire up today at the Make Smoking History Targa West tarmac rally in Perth, one vehicle among the throbbing engines won’t make a sound.

It’s a 2011 Tesla Roadster, making the case for electric vehicles at one of the country’s most arduous closed road races in the Challenge section, lining up against a five high-performance ICE vehicles in the rally, which runs from today until Sunday, August 12.

The Tesla, driven by seasoned motorsports drivers Jurgen and Helen Lunsmann, will face off against a Mazda RX7, BMW 335i, Porsche 911, Lotus Elise and Holden VF SSV.

Over 4 days, the Tesla Roadster will tackle 900 kms of real world roads and curves around the Perth, driving under the flag of charging infrastructure system providers Gemtek.

It’s their third year running in the rally, says Gemtek’s Florian Popp, having previously been represented by Joseph Law in 2016 and Jurgen in 2017, both driving a BMW i3.

It’s the first time they’ve fronted up to Targa West in a Tesla.

With around 25,000 spectators attending the event, Popp says one challenge is being heard above the crowd — and the roar of petrol engines.

But he is optimistic about the presence of the Tesla Roadster at the race.

“We find the rivalry now is breathing new life into motorsport, because the two are so opposed…electric vehicles stand to revolutionise motorsports just because of the performance.”

To deal with the issues of range in the race—Popp explains that while the 2011 Tesla Roadster has a maximum range of 360km, the racing conditions means it can drop to about a third of that—Gemtek have developed a mobile charging infrastructure, which will be delivered where needed via a support car.

While the Tesla’s position against contenders like Porsche and Lotus is by no means certain, real outcomes for the race, says Popp, will be the data they will acquire from the Tesla after the race.

“The Tesla roadster is quite unique in that it was built on the Lotus chassis, so it is suitable for this type of event, but having said that the 2011 is a very early model electric car,” he explains.

“There’s very little information available from Tesla including lack of workshop manuals. While it has all the pedigree of a Lotus, it’s really a bit of an experimental product by Tesla, so it’s a big unknown.”

As well as collecting data post-race, Popp says that they are “working very closely with the Motor Trades Association of WA, firstly to expose their apprentices to electric cars, as well as with Edith Cowan University to then use the data we gain from this year to make further modifications for the 2019 campaign.”

His hopes for the race? It will all depend on keeping up with charging the Roadster.

“Saturday is the hardest day…we’ve got 440km of total distance. I hope we finish, I hope we don’t run out of battery,” he says with a laugh.

Bridie Schmidt is lead reporter for The Driven, sister site of Renew Economy. She specialises in writing about new technology, and has a keen interest in the role that zero emissions transport has to play in sustainability.

Bridie Schmidt

Bridie Schmidt is lead reporter for The Driven, sister site of Renew Economy. She specialises in writing about new technology, and has a keen interest in the role that zero emissions transport has to play in sustainability.

Share
Published by

Recent Posts

Australia’s biggest coal state breaks new ground in wind and solar output

New South Wales has reached two remarkable renewable energy milestones that signal the growing contribution…

6 January 2025

New Year begins with more solar records, as PV takes bigger bite out of coal’s holiday lunch

As 2025 begins, Victoria is already making its mark on the energy landscape with a…

3 January 2025

What comes after microgrids? Energy parks based around wind, solar and storage

Co-locating renewable generation, load and storage offers substantial benefits, particularly for manufacturing facilities and data…

31 December 2024

This talk of nuclear is a waste of time: Wind, solar and firming can clearly do the job

Australia’s economic future would be at risk if we stop wind and solar to build…

30 December 2024

Build it and they will come: Transmission is key, but LNP make it harder and costlier

Transmission remains the fundamental building block to decarbonising the grid. But the LNP is making…

23 December 2024

Snowy Hunter gas project hit by more delays and blowouts, with total cost now more than $2 billion

Snowy blames bad weather for yet more delays to controversial Hunter gas project, now expected…

23 December 2024