Podcasts

SwitchedOn Podcast: 50,000 electric homes with batteries could replace a gas peaker plant

Published by

Mark Purcell has electrified three homes, and is now Deputy Chair of Zero Emissions Noosa in Queensland where he spreads the word to other householders about electrification and decarbonisation.

He’s now on a mission to get 50,000 households to electrify and install batteries – he’s calculated that this number of electric homes will mean one less gas peaker plant is needed during critical hours of peak demand.

Now fully committed to household electrification and decarbonisation, Mark didn’t start his own electrification journey for sustainability reasons.

https://api.soundcloud.com/tracks/1895038077

Reclaim Energy is a proud sponsor of the SwitchedOn Australia Podcast

Anne Delaney is the host of the SwitchedOn podcast and our Electrification Editor. She has had a successful career in journalism (the ABC and SBS), as a documentary film maker, and as an artist and sculptor.

Anne Delaney

Anne Delaney is the host of the SwitchedOn podcast and our Electrification Editor. She has had a successful career in journalism (the ABC and SBS), as a documentary film maker, and as an artist and sculptor.

Share
Published by

Recent Posts

Second wave of big batteries will eat the dinner for fossil fuels, forcing some coal generators to close

The current second wave of big battery projects will kill the economics of most coal…

5 September 2026

Climate Authority’s “misinformation” report hit a nerve at News Corp for a reason

Few organisations have so consistently campaigned to stymie climate action – possibly anywhere on the…

4 September 2026

Energy Insiders: Zero carbon heat, Australia’s next big challenge

Tom Geiser from Good Heat on the technologies to provide carbon-free industrial heat. Plus: LNP's…

4 September 2026

Australia’s climate hypocrisy on show as world braces for global warming “overshoot”

Days apart, one Australian minister called for reduced dependence on fossil fuels, while another literally…

4 September 2026

Gigawatt-hour battery plan edges closer to construction as Swiss giant takes full ownership of site

Swiss storage giant completes purchase of the project site for big four-hour battery, setting a…

4 September 2026

“Golden turbine” complete, in huge milestone at rare state-owned wind farm

Installation of the "golden" turbine is being hailed as a "huge milestone" for a wind…

4 September 2026