Electrification

SwitchedOn podcast: How I electrified – the apartment owner who refused to accept ‘no’ for an answer

Published by

Rowan Hearne was initially told he couldn’t install a hot water heat pump in his 1980s Canberra apartment.

Instead of accepting “no,” he worked with installers, engineers and his strata manager to find practical solutions that allowed him to replace gas hot water with a heat pump, improve insulation and install efficient heating and cooling.

Accessing the ACT’s Sustainable Household Scheme, he completed the upgrades with a 0% loan, making the transition affordable while improving comfort initially for himself and now, his tenants.

Rowan shows that some of the biggest barriers to apartment electrification aren’t technical – they’re about knowing what’s possible, asking the right questions, and finding people willing to help solve problems. 

Click below to listen to the full podcast.

Anne Delaney is the host of the SwitchedOn podcast and our Electrification Editor. She has had a successful career in journalism (the ABC and SBS), as a documentary film maker, and as an artist and sculptor.

Anne Delaney

Anne Delaney is the host of the SwitchedOn podcast and our Electrification Editor. She has had a successful career in journalism (the ABC and SBS), as a documentary film maker, and as an artist and sculptor.

Recent Posts

Climate Authority’s “misinformation” report hit a nerve at News Corp for a reason

Few organisations have so consistently campaigned to stymie climate action – possibly anywhere on the…

4 September 2026

Energy Insiders: Zero carbon heat, Australia’s next big challenge

Tom Geiser from Good Heat on the technologies to provide carbon-free industrial heat. Plus: LNP's…

4 September 2026

Australia’s climate hypocrisy on show as world braces for global warming “overshoot”

Days apart, one Australian minister called for reduced dependence on fossil fuels, while another literally…

4 September 2026

Gigawatt-hour battery plan edges closer to construction as Swiss giant takes full ownership of site

Swiss storage giant completes purchase of the project site for big four-hour battery, setting a…

4 September 2026

“Golden turbine” complete, in huge milestone at rare state-owned wind farm

Installation of the "golden" turbine is being hailed as a "huge milestone" for a wind…

4 September 2026

Can you run a paper mill on solar and “hot bricks”? Visy says it can – on paper, at least

A paddock of solar and an innovative converter could allow Visy to cut gas use…

4 September 2026