Electrification

Surprisingly easy, straightforward and fun – a 3 year journey to electrify

Published by

We started with a single Tesla Powerwall 2 battery (14kwh) which performed brilliantly for about a year, at which time we did some calculations and determined that we were exporting sufficient solar (more than 14kwh on average per day) that could be stored in a second battery.

Both batteries cost $14k (installed) and we calculated payback at around 8 years(warranty is 10 years).

So it made sense economically since we planned to be still living in this house for that time, but with the longish payback it was mostly the environmental benefit, as well as the added benefit of having power during a blackout, although we are lucky that blackouts are fairly rare in our area.

To read more about Peter Horsley’s family electrification of their household – Cars, charging, solar, batteries and cooking and heating, please go to our sub-site on electrification, SwitchedOn.

Share
Published by

Recent Posts

Huge solar and battery project to help propel South Australia towards 100 pct net renewables and beyond

Carlyle-backed Amp Energy lands first of its kind finance for a major solar and battery…

7 February 2025

“Golden age of gas” has not paid off for Australian consumers, manufacturers

Despite the promised riches from Australia's east coast gas export gambit, new report finds main…

6 February 2025

Pro-nuclear lobby group ramps up social media ad spend by nearly 150 pct

A teen-founded lobby group backed by Dick Smith has ramped up its social media advertising…

6 February 2025

World clocks warmest January on record despite La Niña

Despite an emerging La Nina bringing cooler conditions to the tropical Pacific, last month has…

6 February 2025

Massive Neoen wind farm joins race to become Australia’s first in a commercial pine plantation

French renewables giant adds massive new wind farm into race to become Australia's first to…

6 February 2025

Korea industrial giant plans solar and two battery projects in south west NSW

Korean industrial giant unveils plans for a big solar and two battery project in NSW,…

6 February 2025