South Australia doubles size of reserve capacity deal with Hornsdale battery

Published by

The South Australia government and Neoen have agreed to double the size of the reserve capacity made available by the Tesla big battery at Hornsdale to ensure that the Australian Energy Market Operator has the resources to deal with any unexpected incidents in the grid.

The Hornsdale Power Reserve, as it is officially known, signed a 10-year contract for a total of $40 million with the state government in 2017 to provide reserve capacity of 70MW and 29MWh for AEMO to deploy when needed, such as when the major link to Victoria failed.

That landmark agreement was key to helping Neoen deliver the first big battery on Australia’s main grid and what was – for nearly three years-  the biggest lithium-ion battery in the world.

Hornsdale was recently expanded from its original size of 100MW and 129MWh to 150MW and 194MWh, and is due to deliver new services to the grid.

And it seems that AEMO has seized that opportunity to secure extra capacity to deal with the potential shortfalls of inertia in the case of any more failures of the main transmission link, lifting the contracted reserve capacity to 130MW and 32.5MWh.

“On 30 September 2020, Hornsdale Power Reserve (HPR) and the South Australian Government agreed to increase the capacity reservation for HPR to 130MW (and 32.5MWh of energy storage) during any South Australia islanding event,” it says in a new report on system strength and inertia issues,” a new report on system strength and inertia reveals.

It is understood that the agreement is an interim measure while Electranet, the local transmission network, conducts a tender to source more fast frequency response services to address the inertia shortfalls identified by AEMO. Any dollar terms have not been released.

Despite the 10-year contract with the state government, the Hornsdale battery has so far delivered far more revenues in the frequency control and energy arbitrage markets than it has from the state government contract.

The inertia shortfall is likely to exist until a new link to South Australia is built – the $2.4 billion Project EnergyConnect – which is expected to alleviate system strength and inertia concerns. That new link is likely to be delivered by 2024/25, if approved by the energy regulators.

Neoen recently signed a deal with the Victorian state government for an even bigger battery to deliver more grid services to AEMO, this time allowing for the operating capacity of the main transmission link between Victoria and NSW to be expanded.

The contract for 250MW of capacity and 125MWh will attract a payment of $12.5 million a year and will pave the way for an even bigger battery – 300MW and 450MWh of storage to be built near Geelong. That project should be completed next year.

This story has been updated with new information.

Giles Parkinson is founder and editor-in-chief of Renew Economy, and founder and editor of its EV-focused sister site The Driven. He is the co-host of the weekly Energy Insiders Podcast. Giles has been a journalist for more than 40 years and is a former deputy editor of the Australian Financial Review. You can find him on LinkedIn and on Twitter.

Giles Parkinson

Giles Parkinson is founder and editor-in-chief of Renew Economy, and founder and editor of its EV-focused sister site The Driven. He is the co-host of the weekly Energy Insiders Podcast. Giles has been a journalist for more than 40 years and is a former deputy editor of the Australian Financial Review. You can find him on LinkedIn and on Twitter.

Share
Published by

Recent Posts

Australia’s biggest publicly owned wind farm gets federal green tick to go ahead in Queensland

Australia's biggest publicly owned wind farm has been cleared for construction in Queensland coal country…

20 February 2026

Energy Insiders Podcast: How industry, AI and data centres are reshaping demand

GridBeyond CEO Michael Phelan on how industrial loads and data centres are being orchestrated by…

20 February 2026

Australian home battery upstart banks “strategic investment” towards manufacturing plans

Perth-based energy storage and off-grid energy system specialist secures a new private equity investor to…

20 February 2026

Can all solar homes become smart energy hubs? On paper – absolutely! IRL, a few hurdles remain

A South Australian trial to turn homes into grid-responsive energy hubs is now 100 households…

20 February 2026

Plan for Australia’s biggest solar-battery hybrid, with eight hours storage, get federal green tick

Plans for one of Australia's biggest solar-battery hybrid projects have been waved through the federal…

20 February 2026

AI + energy: Monster child of Origin and Facebook – or a smart, decentralised grid?

Will AI’s growing role in the grid democratise clean energy, or simply shift power from…

20 February 2026