Renewables

Solar takes centre stage as renewables and batteries dominate new power capacity in US

Published by

Wind, solar, and battery storage are expected to account for nearly all of the new utility-scale generating capacity set to be brought online in the United States this year.

According to the latest numbers from the US government’s Energy Information Administration (EIA), 2023 is set to be a blockbuster year for the big three renewable energy technologies – wind, solar, and battery storage.

It says these three technologies will account for 82 per cent of overall new capacity. Just 20 years ago, fossil fuels accounted for all but a tiny fraction of new capacity, although the balance has switched in recent years.

Just over half of new US generating capacity expected to be brought online in 2023 will be solar power. According to the EIA, if all planned solar capacity comes online by year’s end, it will be the biggest year for solar capacity additions in the US and the first time more than half of all US capacity additions are solar.

This will be an important step for the United States’ efforts to decarbonise, with the 73.5GW of utility-scale solar capacity online as of January 2023 accounting for 6% of total US generating capacity.

Wind energy is also expected to have a strong 2023, with another 7.1GW expected to be brought online throughout the year.

If all planned wind energy capacity is brought online, it would increase the United States’ total wind energy capacity to 148.4GW.

The wind energy industry continues to be focused on the central part of the United States, known for its blustery wind conditions and wide-open spaces.

As can be seen, solar power is also relatively concentrated in certain locations – such as the US East Coast, California, Texas, and Minnesota.

Finally, EIA data predicts that, to help integrate all this wind and solar capacity, developers are on track to add 8.6GW of battery storage power capacity to the grid by the end of the year, which would double US battery power capacity.

These latest numbers confirm figures published by the EIA early last month which promised that, of the 54.5GW of new utility-scale electric-generating capacity developers are planning to add to the grid this year, 54% will be solar power and another 17% battery storage.

However, predicted wind energy capacity additions increased in the space of just a month.

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Joshua S Hill

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Share
Published by

Recent Posts

Australia’s biggest coal state breaks new ground in wind and solar output

New South Wales has reached two remarkable renewable energy milestones that signal the growing contribution…

6 January 2025

New Year begins with more solar records, as PV takes bigger bite out of coal’s holiday lunch

As 2025 begins, Victoria is already making its mark on the energy landscape with a…

3 January 2025

What comes after microgrids? Energy parks based around wind, solar and storage

Co-locating renewable generation, load and storage offers substantial benefits, particularly for manufacturing facilities and data…

31 December 2024

This talk of nuclear is a waste of time: Wind, solar and firming can clearly do the job

Australia’s economic future would be at risk if we stop wind and solar to build…

30 December 2024

Build it and they will come: Transmission is key, but LNP make it harder and costlier

Transmission remains the fundamental building block to decarbonising the grid. But the LNP is making…

23 December 2024

Snowy Hunter gas project hit by more delays and blowouts, with total cost now more than $2 billion

Snowy blames bad weather for yet more delays to controversial Hunter gas project, now expected…

23 December 2024