Categories: CleanTech Bites

Sod turned at White Rock Wind Farm – are the tables turning for wind?

Published by

Australia’s wind energy industry chalked up a couple of small victories over the weekend, with the turning of the sod at the site of the 175MW White Rock Wind Farm in Glen Innes, NSW.

The event, on Saturday, marks a milestone for the $400 million wind farm, which is finally being built after years stuck in development limbo.

As we have noted here before, White Rock was the first major wind project to be approved after the passage of the new RET, since which time its Chinese owners, Goldwind, sold a 75 per cent share in the project to fellow Chinese firm CECEP Wind-Power Corporation (CECWPC) – a deal that enabled construction to proceed.

The first stage of construction will install 70 2.5MW turbines, although planning approval has been granted for 119 in total, which will be constructed in stages. Once complete, it will be NSW’s largest wind farm.

The second small victory can be spotted in the image below (and in this video), which depicts a certain Barnaby Joyce – Australia’s deputy PM and the Member for New England – shovel in hand, turning the sod for a wind farm that, just one Prime Minister ago, he might easily have objected to.

Barnaby Joyce, third from left, joins owners and developers of White Rock Wind Farm in the official turning of the sod at the Glen Innes site.

Joyce, who has repeatedly questioned the science of climate change, as well as the need to respond to it, has not always been wind energy’s number one fan – he once demanded to know “what this insane lemming-like desire to go to renewables” was going to do to Australia’s economy.

For whatever reason – but quite possibly an election campaign and a challenge by former member and renewable energy enthusiast Tony Windsor – this attitude appears to have changed.

“The project at White Rock will drive innovation and create the jobs of the future, while delivering a financial benefit from the investment of public money,’ Joyce said at the wind farm’s launch last month.

“(It) will be a fantastic boost for the local economy as it is expected to employ up to 200 people during the construction phase and generate 10 full-time positions over a 20 year period.

“This and other clean energy projects proposed for the region will ensure the New England is a major player in the field …and clean energy is essential to meet our emissions reduction targets.”

Indeed, according to the Northern Daily Leader, White Rock is expected to be worth about $35 million to the area around Glen Innes during construction.

More than that, Northern Tablelands MP Adam Marshall said the groundbreaking ceremony was an important symbolic step for the region.

“Except for some defunct hydro schemes, this region has always been an energy importer,” he said.



“First with the Moree Solar Farm, and now with White Rock Wind Farm, we are at last using resources freely available to us to generate energy and keep jobs and revenue here, where the benefit is local.

“Germany has nearly four times Australia’s population living in just 5 per cent of Australia’s area,” he said.

“If it can generate nearly all its energy from renewables, we can too.”

Sophie Vorrath

Sophie is editor of Renew Economy and editor of its sister site, One Step Off The Grid . She is the co-host of the Solar Insiders Podcast. Sophie has been writing about clean energy for more than a decade.

Share
Published by

Recent Posts

Approval sought for another huge wind and battery hybrid as state prepares to move beyond coal

Plans for a massive wind farm with 92 turbines and an up to eight-hour battery…

16 October 2026

Spanish giant wins contracts for transmission projects to connect offshore and onshore renewables

Spanish energy giant snags two major transmission contracts at opposite ends of Australia – one…

15 October 2026

Wind developer signs community benefit deals worth up to $160m to end stalemate over called-in projects

UK developer and local council sign community benefit deals for two projects stuck in limbo…

15 October 2026

Grid-scale renewables hit record levels of investment sign-offs, but the pace still needs to quicken

A record amount of large-scale renewable generation has reached financial close, the federal government says,…

15 October 2026

China’s Envision Energy lines up major wind and eight-hour battery deal at site of Australian mineral sands mine

China's Envision lines up its first wind and battery deal at a new energy park…

15 October 2026

Labor waves through Australia’s biggest wind farm – a project “not possible” under state Coalition buffer policy

Final all-clear for huge wind and battery project comes just in the nick of time,…

15 October 2026