Press Releases

Selectronic launches the new SP PRO Series 2i multi-mode inverter with built-in advanced communications features

Published by

PRESS RELEASE

Australian-owned manufacturer Selectronic has launched the latest version of its flagship product, the SP PRO Series 2i multi-mode inverter with advanced communications features now ‘inside the box’.  Renowned in the industry for its leading performance and reliability, the new Series 2iproduct range replaces the Series 2 and is now available across Australia and New Zealand.

Recognisable by the circular ‘silver seal’, the SP PRO Series 2inew features include advanced communications functionality for multi-phase system operation and high speed interfacing with managed batteries from brands such as LG Chem, BYD, Pylontech and Sonnenschein.

These built-in features provide significant added value to the SP PRO, without the need to purchase additional accessories – saving cost and valuable time during installation.

In addition, the Series 2iwill also feature the latest AC Coupling Recovery Mode, which will allow AC Coupled PV systems to recover from a deep discharge and utilise PV when next available.  This is critical to prevent total system shut-down in properties that rely on a constant source of power.

Practical features like this are possible, thanks to the industry-leading experience gained by the Selectronic team, since its first inverter in 1981.

Lindsay Hart, Head of Sales for Selectronic commented:

“The SP PRO has rightfully earned a reputation over the past 10 years, for unsurpassed power output, durability in the harshest of conditions and a market-leading 10 year warranty.

Our R&D department continues to focus on pushing the envelope to make sure that our battery inverter stays at the forefront of technology, in providing the best product solution in the energy storage market.  The new SP PRO Series 2irange has been designed to help installers by saving them time on-site and providing added value for money.”

Share
Published by

Recent Posts

“HOFF and HON:” Gold mine passes key test, shifts to 100 pct renewables and back again

Remote mine microgrid transitions from hydrocarbons off (HOFF) to hydrocarbons on (HON), demonstrating its ability…

8 November 2024

Alinta signs early contractor deal for first multi-billion dollar pumped hydro project

Alinta signs early contracting deal for proposed multi-billion dollar pumped hybrid project in NSW.

8 November 2024

Land deal signed for deep storage to create Broken Hill mini grid, but network rules still stand in the way

Land deal signed for long duration compressed air storage facility at Broken Hill that the…

8 November 2024

Energy Insiders Podcast: Trump is back, and the frog is still boiling

Donald Trump is back. Richie Merzian from the CEIG joins the podcast to discuss the…

8 November 2024

Tesla Megapacks arrive as former coal site transforms into big Queensland battery

First batch of Tesla Megapacks arrives for installation at one of Queensland's biggest batteries yet,…

8 November 2024

Solar Insiders Podcast: Made in the clean power-generating shade

Will Beaumont on how his company's patented modular technology is making it cheaper, easier and…

8 November 2024