Electric Vehicles

Porsche achieves 3 minute recharge at 450kW EV charging station

Published by

An ultra-fast, 450kW electric car charger has recorded unprecedented charging times with an unnamed Porsche electric car prototype, in testing alongside BMW.

Unveiled by a consortium of companies that includes automakers BMW and Porsche as well as German tech company Siemens, the system is now available for the public to use free of charge, to give EVs a quick hit of 100km extra range in as little as 3 minutes.

The consortium hopes that the ultra-fast charging technology will resolve what has been a major barrier for many considering to “go electric” – a lack of speedy and convenient EV charging.

The FastCharge system, backed by a €7.8million ($A12.27million) grant from the German Federal Ministry of Transport and Digital Infrastructure and using an energy supply system from Siemens, claims to be more than three times as fast as a Tesla supercharger, and tops the speed of Australian-made Tritium Veefil-PK HPC 350kW chargers.

While it is still in testing phase, the actual speed of charging of the system depends on the voltage of any particular vehicle.

However, BMW says that the system can handle up to 920v (which it and Porsche anticipate will be a future benchmark for electric vehicles), automatically adapting to the individual vehicle charging capacities.

Read the full story on RenewEconomy’s electric vehicle-dedicated site, The Driven…

You can also sign up to The Driven’s regular, and free, newsletter here.

Bridie Schmidt is lead reporter for The Driven, sister site of Renew Economy. She specialises in writing about new technology, and has a keen interest in the role that zero emissions transport has to play in sustainability.

Bridie Schmidt

Bridie Schmidt is lead reporter for The Driven, sister site of Renew Economy. She specialises in writing about new technology, and has a keen interest in the role that zero emissions transport has to play in sustainability.

Share
Published by

Recent Posts

This talk of nuclear is a waste of time: Wind, solar and firming can clearly do the job

Australia’s economic future would be at risk if we stop wind and solar to build…

30 December 2024

Build it and they will come: Transmission is key, but LNP make it harder and costlier

Transmission remains the fundamental building block to decarbonising the grid. But the LNP is making…

23 December 2024

Snowy Hunter gas project hit by more delays and blowouts, with total cost now more than $2 billion

Snowy blames bad weather for yet more delays to controversial Hunter gas project, now expected…

23 December 2024

Happy holidays: We will be back soon

In 2024, Renew Economy's traffic jumped 50 per cent to more than 24 million page…

20 December 2024

Solar Insiders Podcast: A roller coaster year in review – and the keys to a smoother 2025

In our final episode for the year, SunWiz's Warwick Johnston on the highs and the…

20 December 2024

CEFC creates buzz with record investment in poles and wires, as Marinus bill blows out again

CEFC winds up 2024 with record investment in two huge transmission projects, as Marinus reveals…

20 December 2024