Wind

Norway’s Equinor to build world’s biggest floating wind farm near Canary Islands

Published by

Norwegian multinational energy company Equinor has received approval to build a 200 MW floating offshore wind farm off the coast of the Canary Islands which would be the world’s largest planned floating offshore wind farm.

Equinor – a company involved in both the renewable market as well as the oil & gas sector, and controversially in proposed oil drilling in the Great Australia Bight  – has confirmed to various trade outlets that it has received a necessary permit to move forward with building the 200 MW floating offshore wind farm, which will require investment of around €860 million (AU$1.3 billion).

The project, to be built in the Canaries Special Zone, could begin operations as early as 2024 – depending on a smooth bureaucratic and regulatory process. The project is expected to create between 120 and 200 jobs during the 20-year lifespan of the project.

Impressively, upon completion, the project will increase the Islands’ total renewable energy capacity by a third. The electricity generated by the project will also be a welcome relief to the Canaries, which currently relies on imported fossil fuels for nearly all its primary energy use.

Canary Islands Minister of Economy, Industry & Trade, Pedro Ortega, explained in a Spanish press release that the development of this potential floating wind farm was an important step towards advancing a more sustainable model for the Canary Islands, and setting the Islands’ up as a leading offshore wind destination.

Equinor is already responsible for the world’s largest operating floating wind farm, the 30MW Hywind Scotland project, which was first approved by the Scottish Government back in late 2015, and which began generating electricity in October 2017.

Hywind Scotland has been a landmark project for Equinor, and for the offshore wind industry as a whole. In early-2018, Hywind Scotland was revealedto be outperforming all expectations, and operating at levels consistently above bottom-fixed offshore wind farms.

Floating offshore wind does not need to rely on specific water-depths but can be tethered to most any depth, allowing projects to be built further out from the shore, out of sight, and accessing stronger and more consistent winds.

Floating offshore wind also serves a further purpose in regions where there are tectonic, volcanic, or extreme weather conditions, where bottom-fixed turbines would simply be implausible.

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Joshua S Hill

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Share
Published by

Recent Posts

State stumps up $10.8 million to help customers electrify as city’s gas network shuts down

State government provides funds to help homes and businesses electrify as the owner of the…

29 April 2026

US predicts stunning 80 GW increase in big solar, wind, and battery storage in next year – despite Trump

If Trump had every heard of the EIA it is likely he would have scrapped…

29 April 2026

“When can I get a job?” Community leaders say coal country ready – and waiting – for offshore wind

As conservative lobby groups continue to push for a "rethink" of Victoria's offshore wind plans,…

29 April 2026

Australia’s sliding doors moment: From “dig and ship” to trusted renewables transition partner

Fossil fuels have been exposed as the weak link in a secure economy and a…

29 April 2026

Solar Insiders Podcast: Can we make climate action great again?

Thom Woodroofe on his new book, Power, Prosperity & Planet, and why making solar as…

29 April 2026

Massive six-hour battery project seeks federal green tick for site in Victoria’s main coal hub

A massive 6-hour big battery has joined the queue for federal approvals for a site…

29 April 2026