Renewables

Northvolt produces first fully recycled lithium-ion battery cell

Published by

Swedish battery developer Northvolt has announced a landmark achievement with the news that it has produced its first battery cell with 100% recycled nickel, manganese, and cobalt.

Northvolt, based in Stockholm, and backed by investors including Goldman Sachs and Volkswagen, has sought to combat mineral supply and waste issues through a recycling program called Revolt.

It has now successfully produced its first lithium-ion battery made with a nickel-manganese-cobalt (NMC) cathode produced entirely from metals recovered through the recycling of battery waste.

All recycling and production processes were completed on a single site at Northvolt Labs in Västerås, Sweden, and the development of the recycling process stands as a potential breakthrough for the battery industry which is looking to transition to a more sustainable manufacturing process.

“What we have shown here is a clear pathway to closing the loop on batteries and that there exists a sustainable, environmentally-preferable alternative to conventional mining in order to source raw materials for battery production,” said Emma Nehrenheim, Northvolt’s chief environmental officer and head of Revolt.

“The recycling process can recover up to 95% of the metals in a battery to a level of purity on par with fresh virgin material. What we need now is to scale-up recycling capacities in anticipation of future volumes of batteries requiring recycling.”

The recycled nickel, manganese, and cobalt metals used in the battery cell were recovered from battery waste using a low-energy hydrometallurgical treatment which involves the use of an aqueous solution to isolate the metals and separate them from impurities.

Northvolt will now turn its attention to scaling-up its recycling capacities, and will modify plans for its Revolt Ett giga-scale recycling plant which is currently under development adjacent to the Northvolt Ett gigafactory in Skellefteå, Sweden.

Revolt Ett will now be expanded beyond its initial design to enable recycling of 125,000 tonnes of batteries per year.

Construction is set to begin in the first quarter of 2022 and Northvolt expects operations to begin in 2023, with incoming material to be recycled coming from two sources – end-of-life batteries from EVs and production scrap from Northvolt Ett.

“As the electric vehicle revolution gains speed, we should be mindful that some 250,000 tons of batteries will reach their end-of-life in Europe by 2030,” said Emma Nehrenheim.

“In this, some see challenges and obstacles. At Northvolt, we see opportunity.”

Revolt Ett will be Europe’s largest battery recycling plant and the only large-scale facility in Europe capable of recycling lithium in addition to nickel, manganese, cobalt, and other materials – including copper, aluminium, and plastics.

 

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Joshua S Hill

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Share
Published by

Recent Posts

Australia’s biggest aluminium smelter gets $2.5 billion to help transition from coal to wind and solar

The $2.5 billion deal to help Australia's biggest aluminium smelter go green will see it…

12 August 2026

Northern Hemisphere extreme heat records just a warm up for the full El Niño theatre

We've seen impacts of the record-breaking El Niño in the Northern Hemisphere – including heat-related…

12 August 2026

The NSW koalas-for-coal shakedown – and what it reveals about the carbon offset market

The NSW government's plan for a Great Koala National Park now includes seeking the rights…

12 August 2026

NSW won’t rule out slippages to coal closure timetable, as first turbine deliveries highlight lack of new projects

NSW energy minister says government will make "hard decisions to extend" coal closures where required,…

12 August 2026

Why solar didn’t work for this dairy farmer, until he added a battery and put it on wheels

High hot water use, an unreliable grid, and milking in the dark were all challenges…

12 August 2026

Coal will close to schedule, says AGL, but to build more wind we need policy certainty in return

AGL says it will stick to its dates for coal plant closure, but wants policy…

12 August 2026