New “mega scale” green hub planned for Northern Territory by Korea giant

Published by

A massive “mega scale” green energy project has been proposed for the Northern Territory which will include wind, solar PV, hydrogen, and battery energy storage systems.

The Northern Territory’s chief minister Natasha Fyles on Wednesday signed a memorandum of understanding (MoU) with Korea industry giant Samsung to develop a massive green energy project.

While there are no specifics on size or exact location as of yet, the MoU paves the way for the NT government and Samsung to investigate the feasibility of a project which would generate clean energy for local manufacturing companies, including Samsung affiliates and help them move to 100 per cent renewables.

A working group comprised of representatives from Samsung and the NT government will be established under the MoU to scope and investigate the feasibility of the project. The MoU will run for a period of two years, during which time suitable locations will be identified.

One of the potential locations already on the list to be investigated is the controversial Middle Arm Sustainable Development Precinct on Darwin harbour.

Several large solar and battery storage projects have already been proposed for the Northern Territory, with the biggest being the Sun Cable project that is targeting new demand in the Darwin area. It is not clear whether this project will set itself up as a competitor to that idea.

“Renewable energy makes economic and environmental sense,” said Fyles. “Signing today’s green energy MoU with Samsung C&T is a key step towards creating local jobs and significantly contributing to the Territory’s drive to become a hub for low emissions sustainable manufacturing.

“The MoU sets out how the NT government and Samsung C&T will work collaboratively to explore options and conduct feasibility investigations including how we can facilitate this project being built in the Territory.

“Samsung knows what Territorian’s know, our solar irradiance and proximity to Asia makes this the ideal place to invest in a green energy future.”

Fyles comments hint at plans for the project to export clean electricity or green hydrogen or green ammonia to the neighbouring Asia Pacific region – as has been envisioned for several projects in the north of the country.

“Samsung C&T is committed to global industry decarbonisation, leveraging the exceptional resources in the Northern Territory,” said Samsung C&T president & CEO of engineering & construction group, Sechul Oh.

“The MOU establishes a collaborative partnership for building a prime hub dedicated to green energy production.

“Together, we aim to decarbonise Australia and South Korea and contribute to the development of a sustainable economy.”

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Joshua S Hill

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Share
Published by

Recent Posts

CIS-winning wind project gains federal green tick, seeks power purchase deal for 2027 construction start

A wind project in Queensland that was named a winner of recent CIS tender has…

15 September 2026

Renewable energy czar proposes national standard to quell farmer insurance fears

National standard - drawn from pioneering work at country's biggest wind farm - to address…

15 September 2026

The financing market for wind and solar projects is nearly dead: Here’s how to turn the corner

The financing market for wind and solar assets is comatose, and super funds would rather…

15 September 2026

Six steps to stop the data centre boom from sending power prices through the roof

How will the federal government make sure that the boom in data centres doesn't blow…

15 September 2026

Global wind giant lays claim to installing turbine with highest ever hub height

Danish wind turbine manufacturer Vestas says it has installed an onshore wind turbine in Germany…

15 September 2026

Administrators call time on Whyalla Steelworks’ coal furnace “delusion,” hundreds of jobs to go

Administrators of Whyalla Steelworks abandon efforts to reboot the plant's coal-fired blast furnace, wiping out…

14 September 2026