Other Good Stuff

Jaguar I-Pace crosses “Chunnel” on single charge

Published by

Jaguar wants to put range anxiety to rest with its new I-PACE SUV due in Australia next month and the company has gone a fair way to doing just that with a 369km drive from London to Brussels on a single charge.

The all-electric performance SUV began its intercity trip on London’s South Bank, with its 90kWh battery fully charged, before heading to the Channel Tunnel terminal at Folkestone in Kent.

But unlike the 80 million vehicles that have made the crossing by train since the Channel Tunnel opened, the I-PACE travelled the 50km through the world’s longest undersea tunnel using its own power.

After emerging into the Calais sunshine from the service tunnel which runs between the two rail tunnels, Stephen Boulter, the Jaguar engineer behind the wheel, headed east and arrived at the historic Mons Des Arts in central Brussels with eight per cent battery charge still left.

Stephen Boulter, Vehicle Integration Manager, Jaguar I-PACE, said: “We know customers won’t compromise on everyday usability so we engineered our electric performance SUV to deliver outstanding real-world range.

“By driving the 369km from London to Brussels on a single charge – and arriving with plenty of range left – we’ve demonstrated how comfortably it deals with long-distance journeys.”

Continue reading the full article on RenewEconomy’s new electric vehicle-dedicated site, The Driven…

Tony Bosworth writes for www.TheDriven.io and RenewEconomy.com.au. He has 35 years experience in journalism, and has been instrumental in launching and editing several automotive magazines including Which Car? magazine in the UK.

Tony Bosworth

Tony Bosworth writes for www.TheDriven.io and RenewEconomy.com.au. He has 35 years experience in journalism, and has been instrumental in launching and editing several automotive magazines including Which Car? magazine in the UK.

Share
Published by

Recent Posts

Snowy starts laying concrete foundations for massive turbines a kilometre underground

Construction of the "hydroelectric station the size of the Sydney Opera House" has started laying…

26 September 2026

Some households are discarding solar panels after just 2 years: PV expert says retirement fee could fix this

Leading solar expert says cost of recycling scheme should be paid by end-users, including solar…

26 September 2026

“Forging the Future”? Coal industry may soon have to face some facts it can’t dodge

A new report finds that monitoring of methane emissions can be significantly improved, particularly for…

25 September 2026

Germany presents fossil fuel transition plan, reaffirms 2045 climate target

Germany's cabinet approves roadmap to phase out oil, coal and gas across energy, industry, buildings and…

25 September 2026

“Uncharted territory:” Weather whiplash sparks tree die-off and ramps up bushfire risk

Eastern Australia is not yet in the grip of a terrible 2019-20-like drought but early…

25 September 2026

Australia’s most pro-coal state is still a hot spot for wind and solar, even after ripping up renewables target

Queensland has ripped up its renewables target and cancelled projects, but it remains a hot…

25 September 2026