Other Good Stuff

Jaguar I-Pace crosses “Chunnel” on single charge

Published by

Jaguar wants to put range anxiety to rest with its new I-PACE SUV due in Australia next month and the company has gone a fair way to doing just that with a 369km drive from London to Brussels on a single charge.

The all-electric performance SUV began its intercity trip on London’s South Bank, with its 90kWh battery fully charged, before heading to the Channel Tunnel terminal at Folkestone in Kent.

But unlike the 80 million vehicles that have made the crossing by train since the Channel Tunnel opened, the I-PACE travelled the 50km through the world’s longest undersea tunnel using its own power.

After emerging into the Calais sunshine from the service tunnel which runs between the two rail tunnels, Stephen Boulter, the Jaguar engineer behind the wheel, headed east and arrived at the historic Mons Des Arts in central Brussels with eight per cent battery charge still left.

Stephen Boulter, Vehicle Integration Manager, Jaguar I-PACE, said: “We know customers won’t compromise on everyday usability so we engineered our electric performance SUV to deliver outstanding real-world range.

“By driving the 369km from London to Brussels on a single charge – and arriving with plenty of range left – we’ve demonstrated how comfortably it deals with long-distance journeys.”

Continue reading the full article on RenewEconomy’s new electric vehicle-dedicated site, The Driven…

Tony Bosworth writes for www.TheDriven.io and RenewEconomy.com.au. He has 35 years experience in journalism, and has been instrumental in launching and editing several automotive magazines including Which Car? magazine in the UK.

Tony Bosworth

Tony Bosworth writes for www.TheDriven.io and RenewEconomy.com.au. He has 35 years experience in journalism, and has been instrumental in launching and editing several automotive magazines including Which Car? magazine in the UK.

Share
Published by

Recent Posts

Energy market rule maker wants to kill “loyalty tax” on consumers – and to hike fixed network charges

Australian Energy Market Commission makes a series of welcome energy pricing reform recommendations, and one…

11 December 2025

One of Australia’s biggest solar farms, in heart of Queensland coal country, reaches full commercial operations

One of the country's biggest solar farms has reached full commercial operations, after being built…

10 December 2025

Gas shutdown in regional towns pushes households toward LPG, not electrification

A planned shutdown of gas networks in 10 regional towns has resulted in households being…

10 December 2025

EU locks in “strong but realistic” emissions reduction target of 90 pct by 2040

European Union members have set a new and binding 2040 climate target of reducing net…

10 December 2025

Financial close reached for four-hour big battery to be built next to Australia’s biggest wind farm

Financial close has been reached for the four-hour big battery next to Australia's biggest wind…

10 December 2025

BHP sells stake in critical Pilbara power network in deal with global fund giant

BHP to sell $A3 billion stake in remote, stand-alone electricity network that is the backbone…

10 December 2025