Climate Progress via Institute for Local Self-Reliance
Going solar keeps getting cheaper, but most of the cost savings have come from less expensive solar panels. “Soft costs,” like permitting and inspections, are a rising share of the cost of a solar installation. Several years ago, these permits could increase the cost of a residential solar project (then around $8.00 per Watt) by 5-10% , highlighted in a 2010 study by Sunrun. But as solar gets cheaper, permitting is going to be a much bigger problem.
A recent analysis by Lawrence Berkeley Labs [pdf] illustrates the benefits of streamlining solar permitting rules: it can cut the cost of a 2011 residential solar project (at $6.00 per Watt) by 5-13%, today’s (at $4.00 per Watt) by 8-19%, and tomorrow’s by as much as 40%!
The report confirms the earlier Sunrun study with a statistical analysis of actual solar permitting rules and the impact on final installation costs. It also lends credence to streamlined permitting schemes (like Vermont‘s) and to the broader efforts to improve solar permitting, like Vote Solar’s Project Permit.
Sydney-based "distributed" renewables outfit inks deal to buy portfolio of 27 small solar and battery…
The demand for batteries - for EVs and grid - has surged in the last…
A massive hybrid renewables and battery project has joined the queue for federal environmental assessment,…
Updated: Snowy Hydro lands $1.9 billion deal to supply 100 pct renewable power for state's…
BMI's Iola Hughes discusses the extraordinary growth of battery storage, for EVs and the grid,…
State says energy regulator and network companies must guarantee ready access to smarter and cheaper…