German indoor ski centre runs on solar, and off grid

Published by

How do you power one of Europe’s largest indoor skiing halls? With the heat of the sun, of course. In fact, the idea to run Germany’s alpincenter – which houses 30,000m² of ski slopes – on solar power has proved to be somewhat of a win-win for the building’s owners, the Dutch Van der Valk Group.

Not only does the 3.6MW Canadian Solar rooftop PV array have the ability to operate the facility year-round – completely independent of the grid and without the need for subsidies – but the shadow it casts on the roof drastically reduces the load on the centre’s cooling technology (which needs to keep the indoor temperature at -1 degree Celsius year-round) and, in turn, reduces the amount of power consumed.

“It is a particular proof of photovoltaic efficiency that a winter sports center – which needs great amounts of energy – uses solar power,” Canadian Solar CEO and chairman Dr Shawn Qu said in a company statement about the project.

And for a project like this, reliability is rather important. “Performance losses are not tolerable,” said Dr Christian Metje, whose Hamburg-based consulting group was hired to deliver an energy solution for the alpincentre that would completely cover its demand using self-generated power.

“Projects like the alpincenter Hamburg-Wittenburg are the future of solar energy,” Metje said: “PV systems that cover the facility’s complete energy demand and that do not depend on public subsidies.”

Sophie Vorrath

Sophie is editor of Renew Economy and editor of its sister site, One Step Off The Grid . She is the co-host of the Solar Insiders Podcast. Sophie has been writing about clean energy for more than a decade.

Share
Published by

Recent Posts

Dismal energy efficiency policy is costing Australian households dearly – in some states more than others

Too many Australian households are being locked into high energy use, high bills and uncomfortable…

1 October 2026

Turbine giant lands contract for Australia’s biggest wind project in two years, its second deal in two days

Vestas has landed a contract to supply turbines to the biggest wind project to begin…

30 September 2026

We must plan for coal mine closures, not approve them because we lack a plan 

I spent all my working life in coal mines before retiring in 2020. Since then…

30 September 2026

El Niño nears record levels as ocean conditions tilt in unfavourable direction for eastern Australia

BoM chart shows giant El Niño climate pattern in the Pacific is nearing record weekly…

30 September 2026

The revolutionary methane detection technology that probably won’t fit into our regulatory box

Report suggests focus has shifted from how we can leverage rapidly improving emissions measurement technologies,…

30 September 2026

“Staring down the climate crisis:” New Greens leaders promise to take fight to One Nation – and to Labor

The Australian Greens has named its new leaders, in a move the party says will…

30 September 2026