Renewables

France gets a step closer to solar roads

Published by

PV Magazine

French energy minister Ségolène Royal has inaugurated a manufacturing plant that will produce the so-called “Wattway” paving, made of solar PV. One of its pilot projects will be a 1 kilometer solar road, built in the same region as where the plant is located.

On 26 July French energy minister Ségolène Royal inaugurated a manufacturing unit for the Wattway photovoltaic panels in Tourouvre, Orne. Wattway is a French innovation and is the result of 5 years of research undertaken by Colas, a transport infrastructure company, and the French National Institute for Solar Energy (INES).

The joint patent for the product is based on crystalline silicon, and although it is very thin, Colas argues it is also “very sturdy, skid-resistant and designed to last,” with the durability to bear all types of vehicles, including trucks. Wattway panels can be applied directly to existing pavements, with the aim of generating green electricity while also allowing traffic to flow.

The new manufacturing facility is adjacent to Colas’ headquarters in the village of Tourouvre, in France’s north western department Orne. The new facility is expected to speed up the panel production time, as the Wattway panels had previously been manufactured at the INES laboratory.

Colas is already taking orders for panels ranging from 10 m2 to 50 m2, however, as of 2017, Wattway panels will be included in the Colas product line and the panel surface will increase.

One of the first applications of the Wattway panels will be a 1 kilometer road in the Onre region, the local council has announced.

France’s energy minister took the opportunity at the event to also announce the mobilization of €5 million in state funding to support the development of the Wattway photovoltaic panel. Royal herself is a great support of the innovative patent and has often spoken publicly of the variety of projects the Wattway can be applied to.

 A Wattway panel, said Colas, can last “at least 10 years depending on the traffic, which speeds up wear. If the section is not covered by heavy traffic – a stadium parking lot for example – then Wattway panels can last roughly 20 years.”

 Furthermore, “given the technical issues involved in the connection process, the panels need to be installed by an authorized technician,” added Colas, who also expressed that “within the next two to three years, it will be possible to install Wattway panels on private roads and driveways.”

Source: PV Magazine. Reproduced with permission.

Share
Published by

Recent Posts

One in 17 Australian homes now has a solar battery, as rebate installs pass 450,000 at one-year mark

Amid the hype around the launch of the Solar Sharer Offer, federal Labor's flagship consumer…

2 July 2026

State becomes first to ban retail energy “loyalty tax,” in bid to save customers hundreds of dollars a year

State acts where the national rule maker has declined to tread, announcing an Australia-first ban…

2 July 2026

Electrochemical “bath” could bring spent lithium-ion batteries back to life, cut cost of recycling in half

Researchers believe they have found a way to recover almost the full life of lithium-ion…

2 July 2026

Thin white strips on brown slopes: Manufactured ski seasons are fuelling the climate problem

Ribbons of manufactured snow remind us that national parks should be front-line responses to climate…

2 July 2026

Giant remote zinc mine aims to reach at least 80 pct renewables with addition of wind farm and big battery

One of the world's largest zinc mines, in remote north-west Queensland, will be run with…

2 July 2026

New $50 million federal fund to slash energy use, build climate resilience at local sport clubs

Game On: A new $50m federal government funding pool will provide one-off grants to up…

1 July 2026