PowAR chief executive Geoff Dutaillis talks about big wind projects, battery storage, the ESB’s new rules and connection problems.
And you can find previous editions of the Energy Insiders Podcast here, or on your favourite podcast platform.
Origin Energy has dropped plans to develop a major wind farm intended for 10 kms…
AGL names Bayswater, Loy Yang and Torrens Island as sites with all the attributes data…
CSIRO study finds households with solar and batteries are enjoying periods of "limitless" electricity, a…
State quietly launches its own version of the Solar Sharer offer, giving households the option…
Latest nuclear status report details the glum state of affairs for the far right's favourite…
The new 400 MW gas peaking plant will be the first for a decade in…