Electric Vehicles

Contracts awarded for Brisbane’s $1b all-electric Metro bus project

Published by

The Driven

Brisbane’s proposed 60-strong fleet of all-electric buses is a step closer, with design and engineering tenders awarded for what will be a major overhaul of Brisbane’s public transport infrastructure, and one of the largest deployments of all-electric transport in Australia.

The Brisbane Move consortium was selected as the successful tenderer for Brisbane City Council’s electric bus network, with the consortium being made up of engineering firm Arup, and international sustainable infrastructure firm Acciona.

The Brisbane Move consortium will be responsible for the engineering design and delivery of the major infrastructure works required of the Brisbane Metro project, which will include a new underground station at the city’s Cultural Centre Precinct.

As part of the project, Brisbane’s Victoria Road bridge will also be closed to general traffic under the plan, and will be exclusively used for buses, and with improved access for both pedestrians and cyclists.

“Arup is extremely proud to help create a sustainable, city-shaping project that will provide greater movement, greater growth and create more jobs and investment opportunities for Brisbane,” Arup Queensland region leader Beth Woods said.

The new Brisbane Metro project will deploy 60 trackless electric buses, across two routes, each with the capacity to carry 150 passengers. The buses will be used to link suburban areas to the Brisbane central business district.

The $1 billion project will provide high-frequency electric bus services, running with a frequency of up to three minutes, with 18 stops.

“Brisbane Metro will breathe new life into our city as we emerge from the coronavirus crisis. That’s why we’re pushing ahead with major works, including the boring of new tunnel under Adelaide Street, so we can create 2600 jobs and supplier opportunities for Brisbane,” Lord Mayor of Brisbane Adrian Schrinner said.

As was <a href=”https://thedriven.io/2019/11/25/brisbane-to-get-60-all-electric-mass-transit-vehicles-for-metro-fleet/”>announced late last year</a>, the purpose built buses and charging network will be developed by Swiss bus manufacturer HESS AG, in a partnership with Australian-based manufacturer Volgren and engineering firm ABB.

It is expected that the buses will be charged at the end of each route using a “flash” charging system, with charges the buses in less than six minutes, before commencing the next route.

HESS has developed a roof-mounted charging system for electric buses, will allows for up to 450kW of power to be delivered to the bus, providing ultra-fast charging capabilities suitable for public transport systems.

To read the full version of this story on RenewEconomy’s electric vehicle dedicated site, The Driven, please click here.

RenewEconomy and its sister sites One Step Off The Grid and The Driven will continue to publish throughout the Covid-19 crisis, posting good news about technology and project development, and holding government, regulators and business to account. But as the conference market evaporates, and some advertisers pull in their budgets, readers can help by making a voluntary donation here to help ensure we can continue to offer the service free of charge and to as wide an audience as possible. Thankyou for your support.

Michael Mazengarb is a climate and energy policy analyst with more than 15 years of professional experience, including as a contributor to Renew Economy. He writes at Tempests and Terawatts.
Michael Mazengarb

Michael Mazengarb is a climate and energy policy analyst with more than 15 years of professional experience, including as a contributor to Renew Economy. He writes at Tempests and Terawatts.

Recent Posts

“Giant leap:” Australia’s first ever offshore wind auction goes live as state seeks first 2 GW of projects

Australia's first ever auction for offshore wind generation capacity is finally underway, but with little…

25 August 2026

Major farm show ploughs on, but some fear Hanson’s opening act will hijack debate towards climate denial

One Nation's Pauline Hanson has been picked to open one of Australia's biggest farm shows…

25 August 2026

Australia’s biggest oil and gas company abandons clean energy plans after cashing in on global fuel crisis

Soaring commodity prices have bolstered the profits of Australia's largest oil and gas producer, as…

25 August 2026

Fake photos, fraudulent claims: Regulator suspends another company from energy upgrades scheme

State regulator suspends another company from participating in energy upgrades subsidy after it was allegedly…

25 August 2026

Network to charge ahead after winning latest legal wrangle over contested Marinus project

The fight may not be over yet as woman leading the campaign against the Marinus-linked…

25 August 2026

From pumps to power systems: Guide launched to help farmers go electric and assess renewable and storage

New guide launched guide to help farmers and regional businesses assess power and electric options…

25 August 2026