Storage

Contractors named for new 12GWh pumped hydro storage project

Published by

A proposed 750MW pumped hydroelectric energy storage project near Mackay in Central Queensland, which would boast storage capacity of 16 hours, has signed contracts with two firms to carry out initial development planning.

The planned pumped hydro storage project is part of the larger Capricornia Energy Hub (CEH), a 1.4GW hub consisting of wind, solar, and pumped hydro storage, currently owned by Copenhagen Infrastructure Partners.

Set to be located on two large rural landholdings in the Mackay Hinterland on Widi Country, and downstream of the Eungella Dam, construction of the Capricornia Pumped Hydroelectric Storage System (PHES) is currently expected to get underway next year, with start of operation set for 2031.

An estimated 600 jobs will be created during peak construction and a further 65 local ongoing jobs during commercial operations.

Once operational, the pumped hydro storage facility will be capable of delivering dispatchable green energy into the grid to power the equivalent of 1.5 million homes.

A joint venture formed between infrastructure firms Gamuda and Ferrovial signed an early contract involvement (ECI) agreement with the Capricornia Energy Hub for the pumped hydro storage project.

The ECI phase is expected to take approximately five months and will deliver a development of an engineering, procurement, and construction (EPC) contract for the pumped hydro storage part of the CEH.

The Capricornia PHES will consist of a 750MW pump with total storage capacity of 12GWh, and will also include an upper off-stream reservoir and a lower reservoir located approximately five kilometres downstream of the Eungella Dam.

“The appointment of ECI partners is a significant milestone for Capricornia Energy Hub as it allows us to draw on Gamuda’s and Ferrovial’s expertise to design a cost-effective pumped hydro,” said John Carr, CEO of Capricornia Energy Hub.

The new Queensland LNP government has already canned the state’s biggest pumped hydro project at Pioneer Burdekin and is reviewing another at Borumba.

It has said it favours smaller pumped hydro projects, but it has also paused approval of several new wind farm developments and does not support the previous government’s renewable energy targets.

The joint venture undertaking the ECI phase brings together Malaysian engineering firm Gamuda Berhad and European infrastructure operator Ferrovial.

“This appointment reflects the strength of our partnership with Gamuda and highlights our dedication to delivering world-class infrastructure,” said Antonio Cañete Berenguer, managing director of Ferrovial Construction Australia.

“Together, we’re shaping Australia’s clean energy future, building on our success in projects like the Coffs Harbour Bypass and Oven Mountain Pumped Hydro Storage project.”

The signing comes a few months after Capricornia Energy Hub received the Final Terms of Reference (ToR) from the Queensland government which provide detailed assessment requirements and regulatory frameworks for continued development, including completion of an environmental impact statement.

Note: This story has been updated to correct the identity of the cancelled pumped hydro project.

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Joshua S Hill

Joshua S. Hill is a Melbourne-based journalist who has been writing about climate change, clean technology, and electric vehicles for over 15 years. He has been reporting on electric vehicles and clean technologies for Renew Economy and The Driven since 2012. His preferred mode of transport is his feet.

Share
Published by

Recent Posts

Solar Insiders Podcast: Why new rules for networks signal a new dawn for consumers

AEMC commissioner Rainer Korte on what the new rules on reporting and data sharing will…

17 July 2026

Developer lands “complete funding package” to begin building state’s largest solar-battery hybrid

Developer says it is good to go on early works and construction of the largest…

17 July 2026

“A really big game-changer:” AEMO looks to battery inverters as syncons prove expensive and hard to find

AEMO says proof that grid forming battery inverters can deliver heartbeat of the grid will…

17 July 2026

Twiggy Forrest’s Squadron abandons plan for troubled New England wind farm

Days after lodging new plans for a more than 500 MW wind farm, Squadron dumps…

17 July 2026

Energy Insiders Podcast: Is Australia on target for a “step change” in energy?

AEMO’S head of systems Nicola Falcon on the 2026 ISP and the importance of grid…

17 July 2026

Australia’s solar PV recycling plans on hold after flagship pilot project suspended

Flagship pilot program to set up 100 sites around the country to collect used solar…

17 July 2026