Press Releases

Broken Hill solar plant viewing platform poses a $10,000 challenge

Published by

PRESS RELEASE

How do you make the viewing platform for the Broken Hill solar plant a design and educational landmark? That’s the challenge AGL Energy Limited (AGL) is setting for artists, designers, architects and engineers, all with a chance to win $10,000 for the best concept.

AGL Head of Government & Community Relations Tony Chappel  said, the AGL Viewing Platform Art & Design Competition is open to professionals and enthusiasts alike.

“Whether you’re a budding art and design student, a professional architect, engineer or an artist, the project is open to everyone of all ages nationwide.

“This is a fantastic opportunity to demonstrate your talents and design flair, we hope to attract a lot of top quality entries. And the ultimate prize is that the winning design will be a major feature of the final viewing platform of the 53 MW solar plant,” Mr Chappel said.

AGL built the 140 hectare Broken Hill solar plant and now manages it on behalf of new owners – the Powering Australian Renewables Fund. The solar plant produces enough renewable energy to power 17,000 homes every year.

AGL launched the Viewing Platform Art & Design competition in conjunction with the Broken Hill Art Exchange (BHAE).

BHAE Director, Susan Thomas encouraged design students and professionals to start putting pen or paintbrush to paper as entries are open from Monday, 9 January 2017 until  Friday, 3 March 2017.

“Opportunities like this don’t come around very often. Not only is the total prize pool money of $15,000 substantial, it’s a great chance for students and professionals to become recognised and get their name out there if they aren’t known already.

“And I’m happy to say as a part of this competition, all entries will have the unique chance of showcasing their work to the public by being a part of our Desert Equinox Solar Prelude exhibition and events calendar,” Ms Thomas said.

All entries will be judged on criteria such as their demonstration of excellence in design, celebration of  environmental practices, solar energy and innovation, contribution to Broken Hill’s artistic and cultural heritage, and practicality and feasibility of construction in line with the AGL Viewing Platform Requirements Brief.

Four finalists will be notified from 7 March 2017 and will each receive a $1,000 assistance package to help develop a presentation of their design to a jury panel, which will be held at a public event on Friday, 24 March 2017.

The finalists and winner of the $10,000 prize will be chosen by a panel of judges appointed by AGL and BHAE. The $1,000 People’s Choice award is to be nominated by the public through a popular vote and the winner will be announced at an awards night ceremony on Saturday, 25 March 2017.

For submission guidelines and details on how to enter visit https://www.brokenhillartexchange.org.au/2017-AGL-Viewing-Platform-Competition.php or phone + 61 8 80883171.

Share
Published by

Recent Posts

“It’s time to switch it on:” How to unlock a commercial rooftop PV power station equal to 10 coal plants

Months-long grid connection delays and costs that up to six times higher than originally quoted…

3 August 2026

Green bank targets small solar hybrids and battery retrofits in new $100 million package as mega projects stall

New CEFC funding campaign focuses on small solar hybrids and battery retrofits, which can be…

3 August 2026

Energy Insiders Podcast: A battery with every wind turbine

Goldwind's John Titchen explains why and how all new wind turbines could come with their…

31 July 2026

Origin reports big dip in gas sales, as demand falls and batteries grab more of energy mix

Australia’s biggest energy retailer reports significant dip in gas sales, as customer demand falls and…

31 July 2026

Two coal state energy ministers come face to face and present wildly different visions of the future

The energy ministers of Australia's two most coal dependent states come face to face. One…

31 July 2026

Labor’s flagship renewable energy scheme has not worked: It’s time to replace the CIS with a CFD

The CIS has not worked. But the capacity it was designed to procure is needed…

31 July 2026