Renewables

Australia’s first offshore wind project says it can cover early exit of Yallourn

Published by

The proposed 2,000MW Star of the South project – what would be Australia’s first offshore wind farm – says it can cover the loss of an early exit of Yallourn, one of Victoria’s three remaining brown coal generators.

Yallourn was not scheduled to close until around 2032, although the Australian Energy Market Operator has now factored in a “staged” closure – unit by unit – from around 2029. But there are many energy analysts who believe Yallourn might not last that long because of its age, the cost of maintenance and its lack of flexibility as more renewables enter the system.

Enter, stage left, the $10 billion Star of the South projects. Its backers have been working for some years on the proposed offshore wind farm – just off the coast of the Latrobe Valley brown coal generators – and is currently pushing for changes to Australia’s environmental acts to allow for the project to proceed to the next stage.

In a submission to AEMO, on the subject of new transmission link options between Victoria and NSW known as VNI West, Star of the South says the new infrastructure investment may not be needed.

“Our modelling shows the Star of the South has the capacity to almost wholly, and reliably, cover the generation shortfall of a Yallourn exit and it would do so, bereft of any short-term transmission upgrade to VNI West,” Star of the South says in its submission.

It also says a project of the scale it is proposing – 2,000MW – should give it a higher preference over a multitude of other projects (up to 20) that might be required to make up the shortfall from a closure of Yallourn. And it says it has the added advantage of generating most of its wind output at different times to the big wind farms centred mostly around western Victoria.

“Our independent third-party modelling shows that during residual peak demand the project has a very high capacity factor and strong inverse correlation to Western Victorian wind projects by virtue of systematic high-pressure climatic conditions that usually prevail in Bass Strait during exceptional hot weather.”

Star of the South – owned by its Australian founders and Australian founders and Copenhagen Infrastructure Partners (CIP) is hopeful that the “Offshore Clean Energy Bill”, which will pave the legislative path to such projects – will be introduced into the Parliament this year.

It has already begun technical and environmental studies off the coast of Gippsland in Victoria,  including studies of the seabed and surrounding marine environment.

Offshore wind has taken off in Europe, and more recently in Asia and the US, with a speed that has defied expectations, bringing down prices to the point where new projects are being bid into the market at “zero subsidy”.

Part of this is due to increased output, with bigger turbines (now reaching up to 14MW each), higher hub heights and larger swept areas that harvest more electricity from the same resource than older machines pushing capacity factors to an average of more than 50 per cent in countries like the UK and Denmark, with some projects reaching the mid 60s in capacity factor terms.

It is not clear, however, what capacity factor or the assumed levelised cost of generation Star of the South would be expecting in a “first of the kind” project in Australia.

But it is arguing that its potential means that it should be considered a “credible” option for the future grid, in the same way that AEMO considers the Snowy 2.0 and Tasmania’s proposed “Battery of the Nation” pumped hydro projects.

“We believe there is merit in considering a state of the world where the Star of the South is built and fully commissioned by early 2027 as Australia’s first offshore wind farm,” it says.

“The development team in Melbourne is currently 35 strong and expected to grow to 50 within the next six months. In November 2019 we deployed floating LiDARs to monitor wind and wave conditions. We have commenced formal planning and environmental assessment processes to ensure the project can be ready in time for forecast coal exits.”

Other analysts have also looked at the options to deal with an early closure of Yallourn, with Reputex last year pointing to a mix of accelerated renewables, rooftop solar, battery storage, virtual power plants and demand management to deal with an anticipated closure as early as 2023.

Another analyst wrote that it could be handled with a big increase in battery storage.See: How 1GW of grid batteries could see Yallourn coal generator close in 12 months.

RenewEconomy and its sister sites One Step Off The Grid and The Driven will continue to publish throughout the Covid-19 crisis, posting good news about technology and project development, and holding government, regulators and business to account. But as the conference market evaporates, and some advertisers pull in their budgets, readers can help by making a voluntary donation here to help ensure we can continue to offer the service free of charge and to as wide an audience as possible. Thank you for your support.

Giles Parkinson is founder and editor-in-chief of Renew Economy, and founder and editor of its EV-focused sister site The Driven. He is the co-host of the weekly Energy Insiders Podcast. Giles has been a journalist for more than 40 years and is a former deputy editor of the Australian Financial Review. You can find him on LinkedIn and on Twitter.

Giles Parkinson

Giles Parkinson is founder and editor-in-chief of Renew Economy, and founder and editor of its EV-focused sister site The Driven. He is the co-host of the weekly Energy Insiders Podcast. Giles has been a journalist for more than 40 years and is a former deputy editor of the Australian Financial Review. You can find him on LinkedIn and on Twitter.

Share
Published by

Recent Posts

“Fewer people calling on coal:” Suburban hotspots revealed as home battery rebates top 200,000

Home battery rebates have already topped 200,000, and heading to two million by 2030, with…

17 January 2026

Home battery installations will match the scale of Snowy Hydro scheme – in a single year

Household battery numbers continue to defy all predictions, and they now look set to match…

16 January 2026

“Too valuable to throw out:” Labor announces first national solar panel recycling pilot program

Federal government announces $25 million for a rooftop solar recycling pilot, with up to 100…

16 January 2026

Fortescue begins work on first wind farm, with self-lifting towers and Australia’s biggest turbines

Andrew Forrest's Fortescue starts construction of its first wind farm, featuring unique "self-lifting" tower technology…

16 January 2026

Standalone battery proposed for old gravel pit gets final planning tick despite long distance objectors

A $200 million standalone battery project that attracted no objections from within 50kms of the…

16 January 2026

Australia’s climate hit regions will need fit-for-future science and modelling

It won’t come as much consolation to Victorian communities picking through the burnt rubble from…

16 January 2026