Large scale wind projects are not getting finance and are not getting built. CEIG’s Richie Merzian discusses potential solutions, the looming CGT threat, and what’s wrong with the CIS. Plus: Big month for EVs, and Fortescue’s plan to eliminate diesel.
Why wind projects are stalled at the gate | Energy Insiders

Related Topics
Latest posts

Another boiler demolished at shuttered coal power plant in spectacular explosion
The second boiler at a former coal-fired power station has been demolished in a spectacular explosion as the energy precinct makes way for a cleaner future.
0




